GE WR49X10180 manual Step

Page 5

Step 12

RTV around the underside of the grommet lip (Figure 10). Insert grommet into hole. Ensure it is pressed completely in, until the base of the grommet lip touches the fresh food floor surface. Clear excess RTV for clean appearance.

Figure 10

Step 13

Use a wire tie to attach the heater wire to the AC harness (right rear harness) for strain relief inside the fresh food compartment. Clip off excess wire tie. Keep the spacing between the heater wire and the DC (right front) harness as large as possible (Figure 11).

Figure 11

Step 14

Route the heater assembly wire down through the installed grommet. Fill inside of grommet around harness with RTV to prevent air leaks (Figure 12).

Figure 12

Step 15

Reinstall all fresh food compartment components. Pull out unit. Remove machine compartment cover.

Step 16

Remove the water valve assembly to provide clearance to connect wiring.

Step 17

Use a wire tie to attach the heater wire to the AC harness as a strain relief in the machine compartment. Try to keep spacing between the heater wire and the rear entering DC harness as large as possible (Figure 13).

Figure 13

4

Image 5
Contents Fresh Food ICE Ball Service BulletinBefore YOU Begin Installation InstructionsStep Drill perpendicular to the surface Step Step ClimateKeeper2 dual evaporator technology