GE WR49X10180 manual Drill perpendicular to the surface

Page 4

Step 7

Apply aluminum tape to the front of the heater assembly. Starting back under the Quick Chill assembly and coming up the front of the heater assembly about 2.5” (Figure 6). Keep the tape as close to the left side fresh food

wall as possible.

Figure 6

Step 8

Cover aluminum tape with white vinyl tape.

Step 9

Route heater wire under evaporator cover as far as possible for as little consumer exposure as possible.

Figure 7

Step 10

Replace evaporator tube cover. Move evaporator cover back into position and replace screws. Remove the cold water reservoir plastic cover. Position the reservoir coils as clear of the right front DC grommet as possible (Figure 8).

Figure 8

Step 11

Ensure power to unit is disconnected before drilling.

Check for Flow Meter wiring harness clearance in doghouse before drilling.

If the unit has precise fill feature, check for wire harness clearance in doghouse before drilling. If wires are in the way, adjust hole location accordingly.

Drill a 1/2" hole straight down into the machine compartment. Locate the hole in front of the right front DC grommet. Hole should be 1” in front of DC grommet edge and 2” from right liner wall (Figure 9).

Drill perpendicular to the surface.

1”

Figure 9

2”

 

3

Image 4
Contents Service Bulletin Fresh Food ICE BallInstallation Instructions Before YOU BeginStep Drill perpendicular to the surface Step Step ClimateKeeper2 dual evaporator technology