GE TBXK17 manual ~earanees, To adjustrollersor Ieveling!egsq

Page 4

Because of potential Saiety haz:trdsLInciercertain conditions, we str{)nglyrticommend against LISe of an ac~aptcrplug. However, it’you still elect to use an adapter, where local codes permit, a ~EMPORARY CONNECTIONmaybe madeto a

properlygroundedtwo-prongwall- outlet byuseof a ULlistedadapter

(Fig.2) availableat mostlocal hardwarestores.

TEMPORARY METHOD .-,

(&DAPTER PLUGS NOT PERMITTED IN CANADA)

ALIGN LARGE

-; INSURE PROPER GROUND

Fig, 2

The larger slot in the adapter mustbe alignedwiththe largerslot in the walloutlet to provideproper poIarityin the connectionof the powercord.

CAUTlON: Attaching adapter ground terminal to walloutlet

cover screw does not ground the appIianceunlesscover screw is metal. and not insulated,and wall outlet is grounded through house wiring.YoushouIdhave the circuit checked by a qualifiedelectrician

to make sure the outlet is properly grounded,

When tiscomecting the power cord fromthe adapterqalwayshold the adapter with one hand. If this is not done, the adapter ground terminalis very likelyto break with repeated use.

Becauseof potential safety hazards under certain conditions, we strongly recommend against the use of all extension cord. However, if you stilI elect to use an extension cord, it is absolutely necessary that it be a UL listed 3-wiregrounding type appliance extension cord havi-

c~earanees

Alow the following clearances for ease 01 installationand proper air Circdation:

sides____ -----3/4°

Top----- ___----l”

Back----__ -----l”

water supply to Ieemaker

(onmodels so equipped)

You willneed to connect your icernaker to a cold water line, A water supplykit containingcopper tubing, shut-off valve,fittingsand instructions is availableat extra cost from your dealer.

men building a new home...

consider providingwater supply to refrigerator jocation.It wil~simplify connection of’an optional auto- matic icernaker should youwishto install one later.

To adjustrollersor Ieveling!egsq

remove base grilleby graspingit at bottom and pullingit out.

I

ROLLER

II

I

 

~

r LEVELINGLEG

Turn roller adjustingscrewsor levelinglegseEockTtiseto raise refrigerator,countercloclttise to lower it. Use adjustablewrench or p~ierson the roller adjusting screw’s3/8” hex head bolt.

When adjustingrollers or leveling legs for proper door closure, bot- tom front edge of cabinet should be approximately3/4” from floor.

To replace base gri]ie~align prongs on back of grille with clamps in cabinet and push forward until gril~esnaps into p}ace.

4

Image 4
Contents Thebestfrom EneWy-Savingnps Preferred R‘-’ Method Save TheseTo adjustrollersor Ieveling!egsq ~earaneesYour refrigerator, push switch to the left position How to Test Temperatures Usethemilktestfor the fresh food~PORTANT FoodStorageSuggestions For ConvenienceFreexercompartment GeneralElectricFood-saversystem AdjustaTempDrawerMoist’n Fresh Drawer Detachable Meat Drawer or Meats9msnacks Drawer Iceservice UserMaintenanceInstructions KcessoriesAMtmaticIcemaler If ice is used infreq~lently,old‘~’US~ ThisProblemSolver When you movePossible Causeand Remedy Refrigerator’spwer crdan!~IhIgRefmgerator Freshfood Orfreezer Compartment 1FROSTOR ICE Crystalson FrozenfoodAutomatic Doesnotwork Slowice Cube FreezingODQR/TASTE RefrigeratorIf YouNeedservice WARRAN~ Pati of the sealed mfrigemting

TBXK17 specifications

The GE TBXK17 is a sophisticated locomotive engineered by General Electric, designed to deliver high performance and efficiency in freight transportation. This model stands out in the crowded field of diesel-electric locomotives, catering to the needs of modern railroads across various terrain and operational demands.

One of the main features of the TBXK17 is its powerful engine, equipped with cutting-edge technology to optimize fuel consumption while maximizing output. The engine is a turbocharged, 16-cylinder design that generates substantial horsepower, allowing for impressive tractive effort and performance under heavy loads. This powerful propulsion system ensures that the locomotive can handle even the most demanding freight tasks, making it a reliable workhorse for freight operators.

The TBXK17 integrates advanced digital technologies, including real-time monitoring systems that track performance metrics such as fuel efficiency, speed, and engine health. This connectivity allows operators to engage in predictive maintenance practices, reducing downtime and improving overall reliability. Furthermore, the use of intelligent software systems enhances operational efficiencies, enabling better scheduling and load management.

In terms of environmental considerations, the GE TBXK17 incorporates features aimed at reducing emissions. The locomotive complies with stringent environmental regulations, thanks to its advanced exhaust treatment systems. This focus on sustainability not only meets legal requirements but also reflects a commitment to reducing the carbon footprint of rail operations.

Another noteworthy characteristic is the TBXK17's design for comfort and safety. The cab is ergonomically designed for the operator's comfort, with modern instrumentation and controls that enhance usability. Safety features, such as enhanced braking systems and advanced traction controls, ensure that the locomotive can operate safely and effectively under various conditions.

The locomotive's robust build quality contributes to its durability, allowing it to withstand harsh operating environments. Its modular design allows for easier maintenance and repairs, minimizing potential interruptions to service. The GE TBXK17 is, therefore, a versatile and powerful locomotive that encapsulates the blend of performance, efficiency, and modern technology, making it a preferred choice for rail operators looking to enhance their freight capabilities.