Step Two
A
B
B
Ice Bank Control
P/N
P/N 3529
C
Red Lead | Black Lead |
P/N 3576 | P/N 3575 |
A.Snap the new ice bank control bulb holder (P/N 3529) onto the second and third coil from the top.
B.Place the ice bank control bulb into the holder and secure it with two poly ties
(P/N
C.Connect the red and black wire leads to the ice bank control as shown.
P/N 185211007 | 2 | 8/25/94 |