3. PREPARE THE HOOD (CONT’D)
FOR VERTICAL DISCHARGE ONLY:
The hood is set up at the factory for vertical discharge. Go to step 4 on page 7. Start on step 4.4.
FOR HORIZONTAL DISCHARGE ONLY:
3.4From inside the hood, unfold the small retaining tab (A) (located on the edge of the blower opening) on the air diffuser edge. See pictures below.
A
HD0109
Folded tab
A
HD0108
Unfolded tab
3.5Remove the metal shutoff plate from the back of the hood, by removing the 3 screws. Set aside scews.
3.6Press the metal shutoff plate on a flat surface to completely flatten bent flange.
HO0031
HD0119
3.7From the top of the hood, slide out the plastic air deviator and discard.
3.8Using the 3 screws removed from 3.5, install the metal shutoff plate on top of the hood.
HO0032
HO0036
- 6 -