Wolf Appliance Company WKGHC ML-767590, WKGHD ML-767589 Leveling, Electrical Connections

Page 6

Install right side panels on both ovens. Connect the piping between the top oven and bottom oven. Pipe joint compound must be resistant to the action of propane gases.

The manual gas valve at the bottom of the control panel should remain off until all electrical connections are made and the ovens are checked or used.

LEVELING

Once the oven is in its permanent position, place a carpenter's level on the oven rack. If the oven is installed on legs, turn the adjustable feet in or out to level oven front-to-back and side-to-side. If the oven is installed on casters, loosen set screws and turn casters in or out to level oven front-to-back and side-to-side. Retighten set screws after leveling.

CHIMNEY

LONG FLUE

EXTENSION

RIGHT ANGLED

FLUE EXTENSION

PL-52221

Fig. 4

ELECTRICAL CONNECTIONS

Electrical and grounding connections must comply with the applicable portions of the National Electrical Code and/or other local electrical codes.

Appliances equipped with a flexible electric supply cord are provided with a three-prong grounding plug. It is imperative that this plug be connected into a properly grounded three-prong receptacle. If the receptacle is not the proper grounding type, contact an electrician. Do not remove the grounding prong from this plug.

The 120 volt models are equipped with a cord and plug.

Refer to electrical wiring diagram located inside the right side panel; remove control panel for access.

Do not turn the power supply on until after the gas connections have been made and checked for leaks.

ELECTRICAL DATA

 

 

 

 

Minimum Circuit Ampacity

Model

Volts

Hertz

Phase

Maximum Protective Device

 

 

 

 

AMPS

 

 

 

 

 

 

120

60

1

15

 

 

 

 

 

WKGHD

200-240

50

1

15

 

 

 

 

 

 

208-240

60

1

15

 

 

 

 

 

WKGHC

120

60

1

15

 

 

 

 

200-240

50/60

1

15

 

 

 

 

 

 

– 6 –

Image 6
Contents Wkghd & Wkghc GAS Convection Ovens Important for Your Safety For Your SafetyGeneral InstallationWkghd & Wkghc GAS Convection Ovens UnpackingInstallation Codes and Standards Installing Basic OvenLocation Assembling the Oven to the Stand Assembling the Legs to the Single OvenAssembling the Chimney to the Single Oven Assembling Stacked OvensLeveling Electrical ConnectionsGAS Connection Testing the GAS Supply SystemBurner AIR Shutter Adjustments GAS Pressures and OrificesOperation Flue ConnectionControls Model Wkghd Fig Using the Wkghd Oven Lighting the Wkghd OvenBefore First USE Controls Model Wkghc Built before October 1999 Fig Thermostat ControlTimer Control Roast ButtonTime Display Colon Gentle Bake Button Gentle Bake ModeOn / Off / Oven Cool Switch Stop / Start ButtonUsing the Wkghc Oven Error Messages Wkghc OvenControls Model Wkghc Built after October Menu SelectManually Setting the Temperature and Cook Time Setting the Oven for Roast & Hold Conserving Energy Roast and Hold Operation Wkghc OvenProper Utensils Operating HintsCleaning Optional Stainless Steel Oven InteriorFor Best Results Meat & Fish ProductsMaintenance Troubleshooting