Kobe Range Hoods CH7936SQB, CH7942SQB, CH7948SQB, CH7930SQB Wall Mount Installation Rear Vent

Page 16

WALL MOUNT INSTALLATION – REAR VENT

***This installation only applied with the purchase of a duct cover.

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE VENT OPENING.

-Decide the location of the venting pipe from the hood to the outside. Refer to Figure 21.

-A straight, short venting run will allow the hood to perform more efficiently.

-Try to avoid as many transitions, elbows, and long run as possible. This may reduce the performance of the hood.

-Use duct tape to seal the joints between pipe sections.

-If necessary, prepare back wall frame with cross framing lumber for secure installation.

-Using references on Table 2 and measurements on Page 22-23, decide the level of the lumber. Refer to Figure 22.

Hood Preparation before Installation

-Temporarily wire the hood to test for proper operation before installing.

-Peel protective film off the hood and the duct cover (if any).

-Remove the screws on the vent cover (rear) and cut along the line of the inner vent cover (rear) opening. Refer to Figure 23.

-Cut the vent cover (rear) opening and reverse to the other side. Refer to Figure 24.

Figure 21

Inner Vent

Cover (Rear)

Figure 22

Reversed

Vent Cover

(Rear)

Figure 23

Figure 24

14

Image 16
Contents Kobe Brand Range Hood English English Important Safety Instructions INJURY, Observe the FollowingWhat to Do If You Smell Gas Components of Package Range Hood Box Duct Cover Box Sold SeparatelyInstallation Please Read Entire Instructions Before ProceedingSafety Warning Under the Cabinet Installation TOP Vent Page Under the Cabinet Installation Rear Vent Page Wall Mount Installation TOP Vent Page Page Wall Mount Installation Rear Vent Page Page Wiring to Power Supply Turn on Operating InstructionsTurn OFF Maintenance To Clean Hood Surface    Specifications Hood DimensionMeasurements & Diagrams Hood-Mounting Bracket Duct Cover-Mounting Bracket Parts List Model no CH7930SQB CH7936SQB CH7942SQB CH7948SQBModel NO. CH7930SQB CH7936SQB Model NO. CH7942SQB CH7948SQB Circuit Diagram Model NO. CH7942SQB CH7948SQB Trouble Shooting Issue Possible Cause SolutionDisclaimer Claims will not be Accepted After the Allocated DaysWarranty Warranty CertificateTWO-YEAR Warranty Service Period ConditionsConsequential Damage Implied WARRANTIES/STATE LAWProduct Registration Record the Following Information for Your RecordFrench Lire ET Conserver CES InstructionsMesures DE Sécurité Importantes Que faire en cas dun incendie de graisse sur la cuisinière Contenu DE LA Boîte Hotte Installée Sous UNE Armoire Avertissement Installation Sous UNE Armoire Conduit Supérieur Installation de la hotte Installation Sous UNE Armoire Conduit Arrière Trou 1po de diamètre Installation Sous UN Îlot Conduit Supérieur Préparation avant InstallationVis de montage Photo Installation avec couvre- conduits Installation Sous UN Îlot Conduit Arrière Couvercle intérieur ArrèreCouvercle inversé arrière Attacher ensemble Avertissement DE Sécurité Mise EN Marche Mode DemploiArrêt ENTRETIEN- Nettoyage Remplacement dune ampoule Commandes SpécificationsMesures et Diagrammes Support de fixation hotte Support de fixation couvre-conduit Liste DES Pièces CH7930SQB CH7936SQB CH7942SQB CH7948SQBCH7930SQB CH7942SQB Diagramme DES Circuits CH7942SQB Problème Cause probable Avis DE NON-RESPONSABILITÉ Certificat DE Garantie GarantiePériode DE Garantie DE Deux 2 ANS Dommages Indirects ServiceGaranties Tacites / Réglementation Enregistrement DU Produit Enregistrez votre produitSpanish Instrucciones Importantes DE Seguridad Qué Hacer si Siente Olor a Gas PrecauciónComponentes DEL Paquete Caja de la Campana de Extracción Vendida por SeparadoInstalación Cálculo antes de la InstalaciónAdvertencia DE Seguridad Debajo DEL GabineteInstalación Debajo DEL Gabinete Ventilación Superior FiguraFigura Agujero de un de diámetro Instalación Debajo DEL Gabinete Ventilación Posterior Figura Instalación Independiente Ventilación Superior Figura Figura Instalación Independiente Ventilación Posterior Figura Figura Cableado Hacia la Fuente de Alimentación Encendido Instrucciones DE OperaciónApagado Mantenimiento Para Reemplazar el Foco Especificaciones Medidas Y Diagramas Page Listado DE Piezas Model NO. CH7930SQB CH7936SQB CH7942SQB CH7948SQBModelo NO. CH7930SQB CH7936SQB Modelo NO. CH7942SQB CH7948SQB Diagrama DE Circuito Modelo NO. CH7942SQB CH7948SQB Problema Posible Causa Solución Cláusula DE Exención Garantía Certificado DE GarantíaPeriodo DE Servicio DE LA Garantía DE DOS Años CondicionesGarantías IMPLÍCITAS/LEY Estatal Daños EmergentesServicio Registro DEL Producto Escriba LA Siguiente Información Para SUS ArchivosVER.091020
Related manuals
Manual 102 pages 8.34 Kb