| Customers Lan | Video Lan | ||
|
| 5 | 4 | |
Hardwire outlet for light, | A A A B C A A B C | |||
mounted sideways | ||||
|
|
| ||
on wood lattice. |
|
|
| |
| On Floor Cable Routing |
| On floor Cable Routing | |
| - Transport cables from T3 |
| - Transport cables from T3 | |
| Power / AV / Lan |
|
|
140
5 12 "
| 85 | |||
Note that the fire |
| 3 | 83 | " |
|
emergency switch is a control switch only. The actual switching should take place in the power cabinet itself.
Fire Emergency switch
(Controls fuse groups A,B and C)
Master Panel
Light
A sign informing about the Fire emrgency switch should be put on the inside wall next to the door. For more on the sign see page 12.
1885
74 14 "
760
29 78 "
Centerline
400
15 34 "
885
34 78 "
Doc Cam Outlet
85
3 38 "
4600
181 18 "
Control Data
Panel
Hardwire outlet for light, mounted sideways
on wood lattice.
2160
85"
111
4 38 "
Doc Cam Capture Area Max. size 760 x 570 Min. size 50 x 45
1695
66 34 "
Doc Cam location in suspended ceiling
87,5 829
3 38 " 32 58 "
885
34 78 "
570
22 12 "
LED prganisation Europe (Junction box and extrs cables supplied by local electrician
Leader Cable | LED 1 | LED 2 | LED 3 | LED 4 | LED 5 |
Leader Cable |
|
| 3 x junction box |
| |
|
|
|
|
| |
4 | 4 single power outlets | 110V/30A, 220V/16A Fuse - Power outlets: A,B,C,D |
| ||
5 | 5 single power outlets | 110V/30A, 220V/16A Doc Cam, Ceiling lights and LED module : Fuse D | |||
| Hardwire outlet - Light | 110V/30A, 220V/16A All Hardwire outlets : Fuse D |
| ||
| Lan outlet |
|
|
|
|
| Ceiling hardwire outlet - Light | 110V/30A, 220V/16A |
|
|
|
140
5 12 "
TANDBERGwww.tandberg.com
Doc. Title: | T3 Electrical System | Related Tandberg Product - TANDBERG T3 | ||||
Drw No.: | 119083 |
| Date: | 04.11.08 | 17.11.08 | 01.12.08 |
Sign.: |
|
| Revision: | 01 | 02 | 03 |
|
|
|
|
|
|
|
Unit: mm/" | Scale: | 1:25 | Sheet Size: A3 |
|
|
119076.02 TELEPRESENCE T3 ROOM REQUIREMENTS 12.08