Desa CDVBP(A) Pressure Testing Burner System Gas Connections, Open Manual Shutoff Valve Closed

Page 20

CDVBN(A) AND CDVBP(A)

CAST IRON STOVE AND BURNER SYSTEM

STOVE AND

DIRECT-VENT BURNER SYSTEM INSTALLATION

Continued

Test Pressures Equal To or Less Than 1/2

Open

Manual

Shutoff

Valve

Closed

Figure 41 - Manual Shutoff Valve

PSIG (3.5 kPa)

1.Close manual shutoff valve (see Figure 41).

2.Pressurize supply piping system by ei- ther opening propane/LP supply tank valve for propane/LP gas burner sys- tem or opening main gas valve located on or near gas meter for natural gas burner system, or using compressed air.

3.Check all joints from propane/LP sup- ply tank or gas meter to manual shutoff valve (see Figure 42 for propane/LP or Figure 43 for natural). Apply commer- cial leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

Gas Valve

Manual

Propane/

Shutoff

LP Supply

Valve

Tank

 

Figure 42 - Checking Gas Joints for Propane/LP Gas Burner System

Pressure Testing Burner System Gas Connections

1.

Open manual shutoff valve (see Fig-

 

ure 41).

2.

Open propane/LP supply tank valve for

 

propane/LP burner system or main gas

 

valve located on or near gas meter for

 

natural gas burner system.

3.

Make sure control knob of burner sys-

 

tem is in the OFF position.

4.

Check all joints from manual shutoff

 

valve to thermostat gas valve (see Fig-

 

ure 42 for propane/LP or Figure 43 for

 

natural). Apply commercial leak test so-

 

lution to all gas joints. Bubbles forming

 

show a leak. Correct all leaks at once.

5.

Light burner system (see Operating

Gas Valve

Manual

Shutoff

Valve

Gas Meter

Stove with Burner System, pages 23

through 25). Check all other internal

joints for leaks.

6. Turn off burner system (see To Turn Off

Gas to Appliance, page 23).

Figure 43 - Checking Gas Joints for Natural Gas Burner System

20

105501

Image 20
Contents For Your Safety For Your Safety What to do if YOU Smell GASSafety Information Cdvbna and Cdvbpa Cast Iron Stove and Burner SystemProduct Features Product Identification Local CodesGlossary Terms OperationPRE-INSTALLATION Preparation Location and Space RequirementsCast Iron Stove and DIRECT-VENT Burner System Assembly Stove Body AssemblyInstalling DIRECT-VENT Burner System Into Stove Body Bolt Stop Adjusting Nut Catch BoltDoor Screw Burner System Bolt Bottom Stove Unit LegInstalling Optional Blower Accessory Installing GA3750/CDA3620T BlowersBlack White Wire Blower Blue Green Rear Cover Wire Blower Ground WireInstalling Rear Cover Firebox Installed In Cast Iron Stove BodyGeneral Venting Location of Vent TerminationGeneral Venting Venting Installation Installation PrecautionsInstallation Planning Installing Vent System in a ChaseSnorkel Minimum Adequate drainage Installation for Horizontal TerminationSnorkel Female Locking Lugs Male Slots Rigid Vent Pipe Vent Opening Combustible WallApply Mastic to All Four Sides Wood Screw Vent Cap Cut Vinyl SidingHorizontal Termination Configurations Horizontal VentingInstallation for Vertical Termination Flat Ceiling InstallationRoof Flashing Wall Strap Elbow Ceiling FirestopLevel Cathedral ceiling support box Cathedral Ceiling InstallationIf area above is a room, install firestop above framed hole Vertical Termination Configurations Restrictor intoCollar of burner System as shownHigh Altitude Installation Parts Lists for Venting Kits and ComponentsComfort Glow Rigid Venting Rvkbk Kit ShownStove DIRECT-VENT Burner System Installation Installing GAS Piping to STOVE/BURNER System LocationInstallation Items Needed Check GAS TypeConnecting STOVE/ Burner System to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections To Flare Fitting on Control Valve Manual Shutoff ValvePressure Testing Burner System Gas Connections Open Manual Shutoff Valve ClosedGas Valve Manual Propane Shutoff LP Supply Valve TankInstalling Remote Receiver Installing LOGS, Lava Rock and Glowing Embers Installing Log NoFor Your Safety Read Before Lighting Manual Lighting ProcedureOperating Stove with Burner System Lighting InstructionsOptional Remote Operation Thermostat Control OperationCghrc Series Operation Cghrct Series OperationOperating Optional Blower Accessory Pilot AssemblyInspecting Burners Burner Flame PatternCleaning and Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement Replacement Parts Wiring DiagramService Hints Technical ServiceSpecifications AccessoriesReceiver and HAND-HELD Remote Control KIT Cghrc Series Manual Blower KIT GA3750Illustrated Parts Breakdown Cdvbna CdvbpaParts List KEY Part Number Description QTYCdvbna and Cdvbpa Stove Chassis Cisc CisgKEY Part Description QTY 02/00 105501-01Rev. E

CDVBP(A), CDVBN(A), CDVBP(A) specifications

Desa CDVBN(A), CDVBP(A), and CDVBP(A) are innovative and cutting-edge technological platforms designed to enhance communication and operational efficiency in various sectors, including business, education, and public services. Each of these platforms boasts unique features and characteristics that make them stand out in their respective fields.

Desa CDVBN(A) is known for its robust hybrid integration capabilities. It allows organizations to seamlessly connect on-premises systems with cloud applications, thereby enabling hybrid workflows and ensuring data consistency across different platforms. One of its main features is a versatile API management toolkit that facilitates the smooth exchange of information between disparate systems. This capability is especially beneficial for organizations looking to modernize their IT infrastructure without entirely discarding legacy systems. Furthermore, its user-friendly interface encourages ease of adoption among non-technical users.

On the other hand, Desa CDVBP(A) focuses primarily on business process optimization. It introduces advanced automation features that streamline repetitive tasks, reduce operational costs, and improve turnaround times. Equipped with machine learning algorithms, CDVBP(A) learns from user interactions to optimize workflows dynamically. This platform’s main selling point is its extensive analytics capabilities, providing organizations with valuable insights into productivity patterns, resource utilization, and areas for potential improvement. Its customizable dashboard allows users to visualize data effectively, thereby empowering informed decision-making.

Desa CDVBP(A), while sharing similarities with its counterpart, takes a more specialized approach aimed at enhancing collaborative efforts within teams. It integrates features such as real-time messaging, file sharing, and project management tools, creating a centralized space where team members can interact and collaborate seamlessly. The platform leverages cloud technology to ensure accessibility from anywhere, making it an ideal solution for remote teams. Additionally, it offers secure data encryption and compliance features, ensuring that sensitive information is protected against unauthorized access.

In summary, Desa CDVBN(A), CDVBP(A), and CDVBP(A) exemplify the future of communication and operational efficiency. Each platform serves distinct yet complementary roles, ranging from hybrid integration and business process optimization to teamwork enhancement. By embracing these technologies, organizations can position themselves competitively in an increasingly digital landscape, improving not only their internal operations but also their overall service delivery.