GE JBS55, JBP99 warranty Prepare the Opening

Page 3

Installation Instructions

2 PREPARE THE OPENING

See illustrations for all rough-in and spacing dimensions.

The range may be placed with 0” clearance (flush) at the back wall and side walls of the cabinet.

**30” Min.

***6”

Min.

Acceptable electrical outlet area.

Orient the electrical

212

**15” Min.

receptacle so the length25 is parallel to the floor.

212

*0”*0”

712

36”

30”

NOTE: Use a 4power cord to prevent interference with the storage drawer. Power cords 412 to 6long may have to be dressed to allow for proper drawer closing.

MINIMUM DIMENSIONS BETWEEN COOKTOP, WALLS AND ABOVE THE COOKTOP:

*** Make sure the wall covering, countertop and cabinets around the range can withstand the heat (up to 200°F) generated by the range.

*** Allow 30” minimum clearance between surface units and bottom of unprotected wood or metal cabinet, and 15” minimum between countertop and adjacent cabinet bottom.

***Recommended spacing to heat-sensitive surfaces.

3

Image 3
Contents Read these instructions completely and carefully For Your SafetyBefore YOU Begin ANTI-TIP DeviceTools YOU will Need Prepare to Install the RangeMaterials YOU MAY Need Parts IncludedPrepare the Opening Electrical Requirements Electrical ConnectionsDo not discard these screws Power Cord Strain Relief InstallationElectrical Connections Do not remove the ground strap connectionCut and discard the ground strap. do not Discard ANY Screws Wire Conduit Installation Remove Storage Drawer Install the RangeReplace the Wire Cover ANTI-TIP Device InstallationLevel the Range Operation ChecklistPage
Related manuals
Manual 32 pages 10.06 Kb