Valco electronic Valve Oven manual Maintenance and Troubleshooting Guide PN 317 091

Page 10

Preventive Maintenance Schedule (PN 317 092 80)

This document provides a list of recommended scheduled maintenance and a year-long log book to record maintenance, observations, supply lists, and service records.

Maintenance and Troubleshooting Guide (PN 317 091 80)

This manual contains instructions for diagnosing and resolving operational problems.

Standard Operating Procedures (PN 317 092 00)

This manual contains instructions, operating sequences, and test criteria for final testing of the TRACE GC Ultra.

Spare Parts Catalog (PN 317 092 10)

This catalog contains a list of spare parts for the TRACE GC Ultra.

x

Operating Manual

Image 10
Contents Operating Manual Disclaimer Contents Appendix a Customer CommunicationAbout This Manual OverviewConventions Used in This Manual Bold Instrument Markings and Symbols Equipment protected throughout by Double Using the Trace GC Ultra Document Set Site Preparation and Installation Manual PN 317 091Maintenance and Troubleshooting Guide PN 317 091 Valve Oven Overview Introduction Valve OvenOptions Trace GC Ultra Valve OvenInstallation and Power Requirements Materials neededPower Requirements and Voltage Selection Valve Oven Components Trace GC Ultra Valve Oven ComponentsValves Heated SectionUnheated Section ColumnValve Oven Overview Valve Installation Opening the Valve Oven Installing Valves in the Heated Oven Installing the Solenoid ValvesValve Installation Installing Valves in the Heated Oven Disassembling the Valve and Actuator Timed Event TE Output JacksInstalling the Valve and Standoff Mechanical Stop Positions for both CW and CCWConnecting Gas Lines from the Solenoid Valve o the Actuator Solenoid Manifold EdgesInstalling the Actuator to the Valve Standoff Testing the Valve Installing the actuator to the valve standoffInstalling the Mounting Bracket Installing Valves in the Unheated CompartmentConnecting Gas Lines from the Solenoid to the Actuator Installing the Valve Bracket Installing an Unheated Compartment Valve Valve Box for up to Six Valves Installing Valves in the Valve BoxValve Box for up to Two Valves Switching Valves Configuring ValvesGas Sampling Valves Mechanical Stop Positions for Switching Valves Operating Manual Operation Operating Valves Manually Trace GC Ultra Keypad, Showing the Valves KeySwitching Off Gas Sample Load Vlv defaults Operating Valves Automatically Adding a Gas Sampling Valve Event to the Run TableScroll to Add Run Time Event and press Enter Adding a Gas Switching Valve Event to the Run Table Operating Procedure Heating the Valve OvenOperating Manual Troubleshooting Leak testingValve Switching Symptom Cause RemedyValve Plumbing Operating Manual How To Contact Us EuropeFinland Africa, Asia and Oceania Turkey United KingdomNorth, Central and South America Peoples Republic of China SingaporeReader Survey Page Glossary ECD See transient NPD See surge UFM Index Index Valve Oven and the Trace GC Ultra