Rondo SUP021YO manual Installation / Circuit Loading

Page 6

20INSTALLATION / CIRCUIT LOADING

The messages displayed by the machine during operation are shown on pg.28.

Important warning for using the “Aqua Prima Filter” can be found at page 28.

Check that all components

Fill the coffee bean container

are correctly placed.

with coffee beans.

The “Aqua Prima” fi lter can be installed (see pg.27).

Fill the tank with fresh drin- king water.

See rating plate

Insert the plug into a sui- table electric socket.

Move the ON/OFF switch

The machine is warming

Place a container beneath

to “I” to turn on the

up; lights are fl ashing.

the steam tube.

machine.

 

 

Turn the knob clockwise

Remove the container.

When lights remain steadily

to terminate the circuit-

 

lit, the machine is ready

loading process.

 

for use.

Turn the knob countercloc-

Wait until a steady stream

kwise to start loading the

of water fl ows out from the

circuit.

nozzle.

Note: You must load the circuit before starting up the machine for the first time, if it has been inoperative for a lengthy period or if the water tank has been completely emptied. The circuit must be also loaded each time the light is steadily lit:

Check the dater on “Aqua Prima” filter; if filter is past its date, replace it with a new one.

Image 6
Contents For Household USE only Important Safeguards Technical Specifications General InformationSafety Rules Aqua Prima filter alarm reset Installation / Circuit Loading Adjustments SBSCoffee Beans 2 Coffees Coffee Dispensing / HOT WaterCoffee Beans 1 Coffee HOT WaterCappuccino CappuccinoSteam SteamDescaling Tank Check Whether the tank is Empty. BCleaning and Maintenance BasicBrew Group Installation Aqua Prima Cartridge FilterDisplay Messages Notes on the Aqua Prima Cartridge Filter Problems Causes Remedies RemediesCod .6.589.64.00 Rev.02 del