Ducted Configuration
1.Use 6" round metal duct to connect the duct collar on the hood to the ductwork above.
2.Use duct tape to make all joints secure and air tight.
3.Insert the decorative flues setting them on the hood.
4.Extend the upper flue to the ceiling and secure with the 2 screws (C).
_,_"UPPER BRACKET
"-WITH SCREWS (C)
DECORATIVE
FLUE
/DUCTTAPE
6"ROUND
METALDUCT
Ductfree Configuration
1.Turn upper flue sect{on upside down so air vents are at the top.
Slide upper flue section into lower flue section.
2.Connect the duetfree pienum to the upper flue section with (4) flat- head screws (supplied).
3.InstalI the reduction on the discharge collar.
4.Measure the distance from the
UPPER | AIR | UPPER |
FLU E SECTION | VENTS | BRACKET |
X | (nn upper fUue section) |
|
[ |
|
|
DUCTFREE |
|
|
PLENUM .... |
|
|
FLUE SECTION |
|
|
5" |
|
|
METAL DUCT |
|
|
top of the reduction to the ceiling. Cut a length of 5" round metam duct 5" shorter than this dimension.
5. Fit duct section over the ductfree | D_SCNARGE | ||
COLLAR | |||
plenum. For best fit, | make sure | ||
| |||
duct seam is toward | the front. |
|
6.Set duct/flue assembly on hood with top tilted away from wall. Reach around flue to engage bottom of duct with discharge
collar on hood. Tilt flue up against wall. Duct seam can be cut to length if necessary.
7.Extend the upper flue to the ceiling and secure with the 2 screws (C).