Milnor KWACSD001R manual Testing Sprinkler Manual Operation

Page 8

,

Cancels three wire disable.

display returns to

Testing Sprinkler Manual Operation

See FIGURE 2 during these procedures.

WAITING FOR LOAD

******************

Test sprinkler by manually running any drycode that calls for heat, then pulling the manual trip handle. Before beginning, turn OFF water valve. This prevents water from flooding the machine during this test.

After the power up sequences, the display shows

WAITING FOR LOAD

******************

Accesses Manual Load menu.

SELECT DRYCODE 00 REDRY

For Quick Return to Run Mode from SPRINKLER TEST

,

,

returns to automatic

etc.,

WAITING FOR LOAD

******************

Accepts the default Drycode 00 and prompts for load size (if machine configured for more than one cake).

Accepts the default load size (full load) and prompts the operator to load dryer. Ignore this prompt.

Starts the cycle. When loading sequence ends, display appears as shown below.

ENTER LOAD SIZE 0 FULL LOAD

LOAD DRYER WITH REDRY

LOADING

00F TIF TOF 000 VP

XX XXXAXXX XXX XXX

alternates

with

00F TIF TOF 000 AIR XXX XXXDXXX XXX XXX

6

Image 8
Contents KWACSD001R Please Read About the Manual Identifying Information on the CoverPage Page What To Do First, If the Sprinkler Actuates- I n t h e u n Stopping the Water Spray and Resetting the SprinklerChecking for Obvious Damage At the Function Switch Panel Removing GoodsChecking for Hidden Damage At the Control PanelFor Quick Return to Run Mode from Sprinkler Test Menu Sprinkler Preventive MaintenanceTesting Sprinkler Automatic Operation Testing Sprinkler Manual Operation For Quick Return to Run Mode from Sprinkler TestCancels drycode in progress