Westinghouse WH09 owner manual Safety tips

Page 2

UL-ES-Crusader-WH09

Safety tips

OBSERVE THE FOLLOWING: READ AND SAVE THESE INSTRUCTIONS

WARNING: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR PERSONAL INJURY, MOUNT TO OUTLET BOX MARKED "ACCEPTABLE FOR FAN SUPPORT",

AND USE THE OUTLET SCREWS PROVIDED WITH THE OUTLET BOX. MOST OUTLET BOXES COMMONLY USED FOR THE SUPPORT OF LIGHTING FIXTURES

ARE NOT ACCEPTABLE FOR FAN SUPPORT AND MAY NEED TO BE REPLACED. CONSULT A QUALIFIED ELECTRICIAN IF IN DOUBT.

1.Installation work and electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards (ANSI/NFPA 70-1999), including fire-rated construction.

2.Use this unit only in the manner intended by the manufacturer. If you have any questions contact the manufacturer.

3.After making the wire connections, gently push connections into outlet box with wire nuts pointing up. The wires should be spread apart with the grounded conductor and the equipment-grounding conductor on one side of the outlet box and ungrounded conductor on the other side of the outlet box.

4.Before you begin installing the fan, switch power off at service panel and lock service disconnecting means to prevent power from being switched on accidentally. When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.

5.Be cautious! Read all instructions and safety information before installing your new fan. Review the accompanying assembly diagrams.

6.When cutting or drilling into wall or ceiling, do not damage electrical wiring and other hidden utilities.

7.Make sure the installation site you choose allows the fan blades to rotate without any obstructions. Allow a minimum clearance of 7 feet from the floor to the trailing edge of the blade.

8.To reduce the risk of fire, electric shock, or personal injury, this fan must be mounted to an outlet box marked suitable for fan support, and use the mounting screws provided with the outlet box. (Mounting must support at least 35 lbs.)

9.WARNING! Do not bend blade holders during installation to motor, balancing or during cleaning. Do not insert foreign object between rotating blades.

10.Attach the mounting bracket using only the hardware supplied with the outlet box. Fan is only to be mounted to an outlet box marked “Acceptable for Fan Support”.

11.WARNING! To reduce the risk of fire or electric shock, do not use this fan with any solid state fan speed control device, or variable speed control.

12.If this unit is to be installed over a tub or shower, it must be marked as appropriate for the application.

13.NEVER place a switch where it can be reached from a tub or shower.

14.The combustion airflow needed for safe operation of fuel-burning equipment may be affected by this unit’s operation. Follow the heating equipment manufacturer’s guideline safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE) and the local code authorities.

15.Before servicing or cleaning unit, Switch power off at Service panel and lock service disconnecting means to prevent power from being switched on accidentally. When the service disconnecting means cannot be locked, securely fasten a prominent warning device, such as a tag, to the service panel.

16.All set screws must be checked and re-tightened where necessary before installation.

 

TOOLS REQUIRED

 

 

Phillips Screwdriver

Wire Cutters

Pliers

Step Ladder

2

Image 2
Contents Manual del usuario Safety tips Consejos de seguridad Features Características Instalación conCOMBO-BLADE PREPARING for installation Antes de la instalación UL-ES-Crusader-WH09 MOUNTING OPTIONS Opciones DE Montaje Choose a MOUNTING OPTION Elija una Opción DE MontajeProceed Directly to PAGE 14 FOR WIRING OPTIONS FLUSH MOUNT Option Opción DE Instalación AL RASOpción CON Varilla Vertical MÁS Larga NORMAL DOWNROD OPTIONPara Cielorraso Normal Loosen downrod ball 1 from downrod 2 by removing set screwSlide downrod ball 1 off of downrod and remove pin UL-ES-Crusader-WH09 Mounting Montaje Wiring Options Opción DE CableadoAsegure el ventilador al cielorraso Blade Installation Instalación de las paletas Instalación del artef acto luminoso To light kit by finger-tighteningOPERATION AND MAINTENANCE OperationOperación y mantenimiento OperaciónCheck for faulty light bulbs Fan will not operate when switch is in the middleWeight and possibly result in smoother operation Check main and branch circuit fuses or circuit breakersAl motor estén apretados Reparar conexiones eléctricas internasNo los apriete demasiado No USE un control de velocidad variable de estado sólidoUL-ES-Crusader-WH09 PARTS LIST Lista DE Repuestos Hardware PackUL-ES-Crusader-WH09
Related manuals
Manual 16 pages 1.17 Kb