OPERATION
Make additional passes until desired depth is reached. During each pass, use only bucket control while working depth. This will allow you to concentrate on controlling bucket angle to maintain a precise cut.
LOADING LOW TRUCKS OR SPREADERS FROM A PILE
For faster loading, minimize angle of turn and length of run between pile and spreader. Back grade occasionally with a loaded bucket to keep working surface free of ruts and holes. Also, hold lift control forward so full weight of bucket is scraping ground.
1585 01/11 | Operation Section |
© 2011 Alamo Group Inc.