Servis-Rhino 2412 manual Operation

Page 69

OPERATION

Lift and roll back of bucket will increase efficiency

because...

A level bucket throughout the lifting cycle resists bucket lift and increases breakaway effort.

NOTE: Do not be concerned if the bucket is not completely filled during each pass. Maximum productivity is determined by the amount of material loaded in a given period of time. Time is lost if two or more attempts are made to fill the bucket on each pass.

2412 01/11

Operation Section 4-25

© 2011 Alamo Group Inc.

OPERATION

Image 69
Contents 2412 To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section General Safety Instructions and Practices Safety2412 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 2412 01/11 Safety Section Safety SL-33 Safety 2412 01/11 Safety Section Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices Safety See Your Rhino Dealer Concluding Safety Instructions and Practices Storage and Parking Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 2412 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Page Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Instructions AssemblyAssembly Proper Ballasting and Wheel Spacing Assembly 2412 01/11 Assembly Section Dismounting Loader Dismounting Loader and Mounting Loader to TractorFor Loader Plumbed to Tractor Remote Valve Preparing Stored Loader for MountingMounting Procedure Page Operation Section Operation Standard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Tractor Requirements Rops and Seat BeltTractor Lighting and SMV Emblem Tractor Ballast Getting On and Off the TractorDismounting the Tractor Boarding the TractorStarting the Tractor Pre-Operation Inspection and Service Loader Pre-Operation Inspection and Service Tractor Pre-Operation Inspection/ServiceMount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Front END Loader Front END Loader PRE-OPERATION Inspection Driving the Tractor and Loader Driving the Tractor and Loader Operating the Tractor and LoaderSG-36 Operation Operation SL-33 Operation Filling the Bucket Operating the LoaderOperation Lifting the Load Operation Dumping the Bucket Operating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Loader Storage Transporting the Tractor and ImplementShutting Down the Implement Operation Transporting on Public Roadways Operation Hauling the Tractor and Implement Trouble Possible Cause Possible Remedy Troubleshooting GuideProblem Possible Cause Remedy Maintenance Section Maintenance 2412 01/11 Maintenance Section Lubrication Schedule Storage Daily MaintenanceStore loader with attachment securely attached Proper Torque for Fasteners Maintenance Maintenance Rhino To the OWNER/OPERATOR/DEALER SOM-01/11 F-3660C Printed U.S.A