2. Recess Installation: The suggested stud construction is illustrated.
3.Sunken Installation: Refer to
D PLUMBING PREPARATION
Position the plumbing according to the roughing)in dimensions. Cap the supplies, and check for leaks.
6.BEFORE INSTALLING UNIT
A PARTIALLY INSTALL BATH DRAIN
Install the drain on the bath according to the drain manufacturer's instructions. When installing the drain overflow tube and hood, be sure to adequately seal along the edges of the hood to prevent leakage.
B INSTALL WOOD FLOOR RAIL
Make sure all rough plumbing and finish flooring are complete. Attach the floor brackets to the floor rail with the screws provided.
Apply | two | beads | of | silicone | sealant | to the | bottom | surface |
| ||||
of the floor rail. Position the floor rail in the desired |
| ||||||||||||
location, and secure to the floor with the screws |
|
| |||||||||||
provided. |
|
|
|
|
|
|
|
|
|
|
|
| |
Use at | least | four | people to | carefully | lift | the | bath | inside |
| ||||
the floor rail. | Position the | bath so | there | is | equal | Apply Silicone | |||||||
space |
| ||||||||||||
between the bath skirt and the floor rail. |
|
|
| Sealant |
| ||||||||
|
|
|
|
| |||||||||
Insert | the | dowels in the ends of the floor | rail. | Apply | Dowel | ||||||||
silicone sealant to the end rails, and press them |
|
| |||||||||||
completely | onto the | dowels. | Remove | any | excess | sealant. |
|
Screws
Floor
Bracket
5 | Kohler Co., Kohler WI U.S.A. |