Kohler K-7158, K-7159, K-700, K-1172 dimensions Gg G, Roughing-In Notes, Cutout Detail

Page 1

VINTAGE

￿CAST IRON BATH K-700

￿￿

￿￿￿G￿￿￿G￿￿￿￿ ￿￿￿￿￿ ￿￿￿￿￿G￿

￿￿￿￿

 

 

 

￿￿

￿￿D￿￿￿￿G ￿￿￿￿￿￿￿￿￿￿￿

￿￿ ￿￿￿D￿C￿ ￿￿￿￿￿￿￿￿￿￿￿

Accessories/hardware:

Drain for drop-in

K-7158

recommended

 

 

 

Drain for free-standing

K-7159

recommended

 

 

 

Adjustable legs

K-1172

optional

 

 

 

Fixture*:

basin area

top area

weight

 

 

 

 

Bathing

44º (111.8cm)

60º (152.4cm)

485 lbs.

well

x 24º (61cm)

x 32º (81.3cm)

(220kg)

 

 

 

 

 

water depth

capacity

 

 

 

 

 

Overflow

15º (38.1cm)

82 gals.

 

 

 

(310L)

 

 

 

 

 

* Approximate measurements for comparison only.

 

 

 

Included Components:

 

 

 

 

 

Cutout template

 

106594-7

 

 

 

 

C￿ ￿￿￿￿￿￿￿￿￿￿￿￿ ￿￿￿￿￿

￿￿￿￿￿￿￿ ￿￿￿￿￿￿ ￿￿￿￿￿ll￿￿￿￿￿ ￿￿￿￿￿￿￿￿￿￿￿ ￿￿f￿￿￿ ￿￿g￿￿￿￿￿g

￿￿￿ ￿￿￿￿￿ll￿￿￿￿￿￿

NOTICE: The floor must support 2,000 lbs (907kg). This is the combined weight of the bath, water, and two bathers. Pre-plan access for moving the bath into the construction area; the bath is heavy and will not fit easily through door- ways.

Roughing-In Notes

Fixture dimensions are nominal and conform to toler- ances in ANSI Standard A112.19.1.

No change in measurements if connected with drain illustrated.

13-1/4º

18-1/4º

(33.7cm)

(46.4cm)

 

1-1/8º

(2.9cm)

69º (175.3cm)

19º R. (48.3cm)

CUTOUT DETAIL

40º (101.6cm)

 

 

 

 

42º (106.7cm)

 

2-3/8º

 

 

 

 

(6cm)

 

 

 

 

 

 

10-3/4º

(27.3cm)

36º (91.4cm)

(10.2cm)

72º (182.9cm)

3-3/4º (9.5cm)

3º (7.6cm)

110050-2-￿￿

4º (10.2cm)

21-3/16º (53.8cm)

1-1/2º I.P.S. THR'D.

1-1/2º O.D.

Image 1
Contents Roughing-In Notes GG GCutout Detail Wood Towel BAR GG G DG W GBASE/CERAMIC Floor Rail Product Requirements Clearance Requirements NEW Replacement InstallationSummary of KEY Requirementsb Product Inspection Materials Required ToolsOLD Bath Removal Site PreparationSubfloor Preparation Stud Pocket PreparationPartially Install Bath Drain Before Installing UnitInstall Wood Floor Rail Plumbing PreparationInstall the Towel BAR Install the Wood RIMProtect Bath Unit Install Plumbing Install the BathOption For Sunken Installation Set SetinCLEAN!UP After Installation Install the Faucet Trim Install Handles and SpoutImportant Care and Cleaning Information Complete the Finished Wall