Echo 99944200470 specifications Maintenance

Page 15

99944200470

MAINTENANCE

 

 

3.Rotate blade until holes in inner blade adapter (B) and gear box align. Insert locking tool to lock PTO shaft (C).

Note: Blade nut (D) is left hand thread.

4.Remove blade nut (D) in a clockwise direction using T-wrench. Remove outer blade adapter (E), blade (F) and inner blade adapter (B).

5.Clean all loose debris from gear box.

6.Remove plug (G) and check level of grease. Grease should fill gear case to bottom of grease plug hole.

7.Add grease if necessary using squeeze-type tube. Do not use high pressure grease gun. DO NOT over-fill.

8.Install inner blade adapter (B) onto PTO shaft (C).

9.Install and center new blade (F) onto inner adapter (B).

10.Install outer adapter (E) and nut (D). Tighten nut (D) firmly, counterclockwise (CCW).

Note: Never reuse old split pin.

11. Install new split pin (A) to secure nut.

B

C

F

E

D

A

G

X7532278708

15

© 09/2013 ECHO Inc.

Image 15
Contents Operator’s Manual Table of Contents Servicing Information Introduction99944200470 SafetyAdditional or Replacement Manuals Manual Safety Symbols and Important InformationPersonal Condition and Safety Equipment International SymbolsVibration and Cold Hearing ProtectionProper Clothing Hot Humid WeatherKeep a Firm Grip Repetitive Stress InjuriesRead the Manuals Clear the Work AreaAvoid Hot Surfaces EquipmentShaft Label DescriptionContents Power Head Shaft/Lower Shaft Assembly AssemblyOperation Techniques OperationOperation Skill Levels MaintenanceMaintenance Intervals Blade Replacement/LubricationMaintenance Drive Shaft Lower Storage Storage Hook InstallationModel SpecificationsOWNER’S Responsibility Warranty StatementsWarranty Statements 99944200470 99944200470 99944200470 ECHO, Incorporated
Related manuals
Manual 13 pages 1.09 Kb