Brinly-Hardy ST-151BH, ST-251BH owner manual Parts List Trailer Assembly

Page 7

PARTS REFERENCE

PARTS LIST (Trailer Assembly)

REF

ST-151

ST-251

DESCRIPTION

QTY.

NO.

PART NO.

PART NO.

 

 

33.

B-3034-10

B-3034-10

Clevis

1

34.

B-6322F-10

B-6322F-10

Towbar

1

35.

B-5922

B-5922

Logo, Decal

1

36.

B-6322R-10

B-6322R-10

Base, Rear

1

37.

B-5684-01

B-5684-01

Axle

1

38.

S-1142

S-1142

Boom Support

2

39.

S-1141-10

S-1141-10

Boom Center Bar

1

40.

B-7761R-10

B-7761R-10

Boom Extension, RH

1

41.

B-7761L-10

B-7761L-10

Boom Extension, LH

1

42.

B-5692

B-5692

Wheel

2

43.

45M2121P

45M2121P

5/8” Flat Washer

4

44.

B-3861

B-3861

Hitch Pin, 1/2 x 2-1/2 Inch

1

45.

B-4355

B-4355

5/16” Whiz Lock Nut

12

46.

B-5691

B-5691

Axle Spacer

2

47.

B-5695

B-5695

5/16” x 5/8” Hex Flange Bolt

10

48.

D-146P

D-146P

Hairpin, Cotter

1

49.

F-577

F-577

5/8” E-Ring

2

50.

F-782

F-782

Knob

2

51.

R-1946

R-1946

Decal, Instruction

1

52.

R-618

R-618

Washer, Special

4

53.

L-1744-4

L-1744-4

Label, Serial Number

1

L-1914 Rev. B

6.

Image 7 Contents
N E R ’ S M a N U a L Introduction Safety Safety Towing Safely Parts Reference Exploded View Tank AssemblyDescription Parts List Tank AssemblyExploded View Trailer Assembly Parts List Trailer Assembly 1a. Install Clevis 33 to the Tow- bar Assembly1415 Swivel Nuts6a. Attach the 30 inch Hose Hose to Pump8a. Install Axle 37 in to Rear Base Install TowbarSupports To Boom Supports and tighten snugly using KnobConnect Pump Supply Hose to Boom Connect Sprayer Hoses Removing Sprayer Installing SprayerInstalling Electrical Connections OperationApplication Rate Pump OperationsWand Operations Boom OperationsExample Calculation Procedure for Sprayer ApplicationTowing Vehicle Requirements Calibration of SpeedMaintenance MaintenanceSpecifications 1914 Rev. B Pull Behind Accessories