Bradley Smoker HN200 Installation Instructions …, Make plumbing connections

Page 5

 

ADA Compliant Recess-Mounted Shower

Installation Instructions

HN200

 

 

Installation Instructions continued…

Step 2: Make plumbing connections

NOTE: Hoses need to be connected to 1/2" NPT pipe supply before the shower is fastened to the wall.

1.Make water supply connections to the stainless steel hoses (see Figure 2). Equa-Flo™ and Thermostatic= 1/2" NPT Hot and Cold supplies. Single Valve, Accu-Zone™ Infrared Control, Air Valve and Touch Time™ = 1/2" tempered supply.

Step 3: Install face plate and grab bar

1.Position the face plate on the wall. Mark the wall and install twelve wall anchors suitable for use with 1/4"-20 x 3/4" button head Allen key screws (see Figure 3).

2.Attach the face plate to the wall with twelve 1/4"-20 x 3/4" button head Allen key screws provided (see Figure 3).

3.Attach the grab bar to the wall.

• Position the “L” of the grab bar to fit the back wall of the

shower stall.

 

 

 

 

 

 

 

 

VALVE LEFT

 

4. Use the flange as a template and mark the six screw hole

 

 

 

 

 

 

 

SEAT RIGHT

 

 

Figure 2

locations and install six anchors supplied by installer for

 

 

 

 

 

 

 

 

 

1/4"-20 x 1-1/4" flat head Allen key

 

 

 

 

 

 

 

 

 

 

screws (see Figure 3).

 

 

 

 

 

 

 

 

 

 

 

 

5. Secure the grab bar to the six wall

 

 

 

 

 

anchors using six 1/4”-20 x 1-1/4"

 

 

 

 

 

flat head Allen key screws (provided

 

 

 

 

 

by installer) (see Figure 3).

 

 

 

 

 

 

 

 

 

 

1/4"-20 x 3/4"

 

 

 

 

 

 

BUTTON HEAD

 

 

 

 

 

 

ALLEN KEY SCREW

 

 

 

 

 

 

(12) PLACES

 

 

 

 

 

 

(160-143)

 

 

 

 

 

 

 

 

 

 

 

 

 

FACE PLATE

 

 

 

 

 

 

 

 

NOTE: ALL WALL

 

 

 

GRAB BAR

 

ANCHORS SUPPLIED

 

 

 

(S53-184)

 

BY INSTALLER.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1/4"-20 x 1-1/4"

 

 

 

 

 

FLAT HEAD ALLEN

 

 

 

 

 

 

KEY SCREW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 3

VALVE LEFT - SEAT RIGHT

 

Bradley Corporation • 215-1189 Rev. F; EN 02-342

5

Image 5
Contents HN200 Table of ContentsSupplies required for installation Pre-Installation InformationHN200 Recess-Mounted Shower Warranty OverviewHN200 Components and Shower Stall Dimensions Rough in piping for shower Installation InstructionsMake plumbing connections Installation Instructions …Install face plate and grab bar Mount shower seat Install curtain rodSpecial Situations for Material Cleaning and Maintenance Instructions for Stainless SteelShower Curtain Repair Parts Shower Seat Repair Parts