Alamo 6212 manual Assembly Instructions

Page 34
(SL-23)

ASSEMBLY

ASSEMBLY

Assembly Instructions

To avoid injury during installation of the loader attachment, do not allow bystanders within 10 feet of loader or attachment.

Always wear safety glasses when removing or installing buckets.

Always use a drift and hammer made of non-sparking material (a shot-filled mallet is recommended) to install or remove pins. A steel hammer or drift could generate flying metal fragments and result in injury. Always wear safety glasses when using a hammer to remove or install pins.

Always have a heavy attachment, such as a bucket mounted on loader when it is removed from tractor.

It is important not to put excessive weight on parking stands with lift cylinder retraction. Damage may result.

Never allow anyone to get under the loader or attachment or to reach through the loader lift arms when raised. Serious injury could result from crushing or pinching by the loader or attachment. (SL-06)

Make sure the loader is properly attached to the tractor and the retaining pins securely lock the loader into position. Improper mounting of the loader onto the tractor can result in the loader falling causing serious injury.

6212 01/11

Assembly Section 3-2

© 2011 Alamo Group Inc.

Image 34
Contents 6212 To the Owner/Operator/Dealer Table of Contents Page Safety Section Safety General Safety Instructions and Practices6212 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 6212 01/11 Safety Section Safety SL-33 Safety Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices 6212 01/11 Safety Section Storage and Parking Safety Instructions and Practices Concluding Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 6212 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Page Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Assembly InstructionsAssembly Proper Rear Ballasting and Wheel Spacing Dismounting Loader and Mounting Loader to Tractor Dismounting LoaderAssembly Mounting Loader Page Operation Section Operation Standard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Rops and Seat Belt Tractor RequirementsTractor Lighting and SMV Emblem Getting On and Off the Tractor Tractor BallastBoarding the Tractor Dismounting the TractorStarting the Tractor Pre-Operation Inspection and Service Tractor Pre-Operation Inspection/Service Loader Pre-Operation Inspection and ServiceMount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Front END Loader Front END Loader PRE-OPERATION Inspection Driving the Tractor and Loader Operating the Tractor and Loader Driving the Tractor and LoaderSG-36 Operation Operation SL-33 Operation Operating the Loader Filling the BucketOperation Lifting the Load Carrying the Load Dumping the Bucket Lowering the BucketOperating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Transporting the Tractor and Implement Loader StorageShutting Down the Implement Operation Transporting on Public Roadways Operation Hauling the Tractor and Implement Troubleshooting Guide Trouble Possible Cause Possible RemedyPage Maintenance Section Maintenance 6212 01/11 Maintenance Section Lubrication Schedule Daily Maintenance Cylinder Service Lift and Bucket Cylinder DisassemblyLift and Bucket Cylinder Reassembly Storage Maintenance Proper Torque for Fasteners Maintenance Maintenance Page Rhino To the OWNER/OPERATOR/DEALER SOM-01/11 F-4701C Printed U.S.A