OPERATION

OPERATION

LOADER BOOM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly installed.

Check condition of bushings at boom pivot points.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly. OPS-L-0005_B

HYDRAULIC LINE INSPECTION

Check for hydraulic leaks along hoses, cylinders and fittings. IMPORTANT: DO NOT use your hands to check for oil leaks. Use a piece of heavy paper or cardboard to check for hydraulic oil leaks.

Inspect the condition of the valve weldment.

Ensure fitting is properly connected

Inspect condition of bushings. OPS-L-0018_B

BUCKET INSPECTION

Ensure all pins are in place.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly.

Inspect the condition of the bucket lug weldments.

Inspect condition of bushings.

OPS-L-0007_B

Hydraulic Hoses

Bucket Pins

6212 01/11

Operation Section 4-14

© 2011 Alamo Group Inc.

Image 54
Contents 6212 To the Owner/Operator/Dealer Table of Contents Page Safety Section Safety General Safety Instructions and Practices6212 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 6212 01/11 Safety Section Safety SL-33 Safety Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices 6212 01/11 Safety Section Storage and Parking Safety Instructions and Practices Concluding Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 6212 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Page Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Assembly InstructionsAssembly Proper Rear Ballasting and Wheel Spacing Dismounting Loader and Mounting Loader to Tractor Dismounting LoaderAssembly Mounting Loader Page Operation Section Operation Standard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Tractor Requirements Rops and Seat BeltTractor Lighting and SMV Emblem Getting On and Off the Tractor Tractor BallastBoarding the Tractor Dismounting the TractorStarting the Tractor Pre-Operation Inspection and Service Tractor Pre-Operation Inspection/Service Loader Pre-Operation Inspection and ServiceMount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Front END Loader Front END Loader PRE-OPERATION Inspection Driving the Tractor and Loader Operating the Tractor and Loader Driving the Tractor and LoaderSG-36 Operation Operation SL-33 Operation Operating the Loader Filling the BucketOperation Lifting the Load Carrying the Load Dumping the Bucket Lowering the BucketOperating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Loader Storage Transporting the Tractor and ImplementShutting Down the Implement Operation Transporting on Public Roadways Operation Hauling the Tractor and Implement Troubleshooting Guide Trouble Possible Cause Possible RemedyPage Maintenance Section Maintenance 6212 01/11 Maintenance Section Lubrication Schedule Daily Maintenance Cylinder Service Lift and Bucket Cylinder DisassemblyLift and Bucket Cylinder Reassembly Storage Maintenance Proper Torque for Fasteners Maintenance Maintenance Page Rhino To the OWNER/OPERATOR/DEALER SOM-01/11 F-4701C Printed U.S.A