Setup
9. Place the cable into the cable bracket notch and secure with the two nuts. Make sure the nuts are centered on the bracket.
10. Wrap the cable hanger strap over the cross shaft and feed the loose end of the cable through the strap holes as shown in Figure 5. Route the cable around the back side of the cross shaft. Install the other cable hanger strap on the right side of the cross shaft. Set the cable aside.
Figure 6
1. | Discharge baffle bolt | 3. Gate linkage assembly |
| head |
|
2. | Deck tab |
|
12. Insert the chute pivot rod through the first tab on the deck, gate linkage assembly, and discharge deflector (see Figure 7). Install the link pivot bracket onto the link pivot channel, located on the gate linkage assembly. Route the chute pivot rod through the link pivot bracket, the tabs on the deck, gate linkage assembly, and discharge deflector and install the hairpin. Orient the hairpin as shown in Figure 7.
Figure 5
1. | Foot pedal | 4. | Cross shaft |
2. | Cable bracket | 5. | Cable hanger strap |
3. | Cable |
|
|
11. Install the gate linkage assembly onto the deck as shown in Figure 6. Make sure the discharge baffle bolt head is positioned to the outside of the deck. Turn the bolt around if necessary.
Figure 7
1. | Chute pivot rod | 4. | Discharge deflector |
2. | Deck tab | 5. | Hairpin |
3. | Link pivot bracket |
|
|
13. Push down the front of the foot pedal and place the link pivot bracket in the unlocked position (Figure 8), attach the cable end onto the gate lift link. Orient the hairpin as shown in Figure 8 and install into the gate lift link.
9