STEP 18: (SEE FIGURE 17)

Turn the clutch/idler assembly right side up.

Slightly loosen the hex bolt next to the fl at idler pulley. Install the drive belt down between the hex bolt and the

at idler pulley with the fl at side of the belt against the pulley. Retighten the hex bolt.

Loop the belt around the large v-pulley, placing it between the v-pulley and the hex bolt next to the pulley.

STEP 20: (SEE FIGURE 19)

• Assemble the drive belt onto the engine pulley fi rst

and then onto the large pulley on top of the clutch/

idler assembly. Place the belt to the inside of the idler

pulley and the belt keeper bolt located beside the

large pulley.

Place tension on the belt by pulling the left side

tensioning chain (JJ) out as far as the 3/32" hairpin

cotter in the chain will allow. Secure the chain in this

HEX BOLTS

DRIVE BELT

FIGURE 17

FLAT IDLER PULLEY

position by inserting a 1/8" hairpin cotter (EE) through

the chain.

IMPORTANT: Do Not assemble the drive belt around the outside of the keeper bolt beside the large pulley.

Go to step 48 on page 21.

CLUTCH/IDLER ASSEMBLY

ENGINE

PULLEY 1/8" HAIRPIN

COTTER (EE)

Did you choose the correct drive belt for STOP your tractor? Using the wrong length belt

may cause premature bearing or belt failure.

STEP 19: (SEE FIGURE 18)

Attach the clutch/idler assembly to the tractor frame. Hook the notched suspension arms onto the two shoulder bolts (M) assembled to the outside of the tractor frame. Lift the front of the assembly and attach it to the R.H. and L.H. hanger brackets using two pivot lock pins (GG) and 1/8" hairpin cotters (EE).

PIVOT LOCK PIN (GG)

L.H. HANGER

SHOULDER

(use second hole)

BRACKET

BOLT (M)

 

 

 

 

 

 

 

 

 

1/8" HAIRPIN

 

 

 

COTTER (EE)

 

IDLER PULLEY

CHAIN (JJ)

(L.H. SIDE)

KEEPER BOLT

FIGURE 19

VIEWED FROM UNDERNEATH

FIGURE 18

VIEWED FROM LEFT SIDE

12