A.O. Smith 186965-001, 505 Series 100, 705 Series 100 manual Tion.On-Demand Water Heater Primary

Models: 705 Series 100 186965-001 505 Series 100 305 Series 100

1 40
Download 40 pages 24.22 Kb
Page 27
Image 27

For this application:

Pump should be controlled by an Aquastat, Timer or Combination Aquastat and Timer.

Pump to be sized to maintain circulation loop temperature.

A minimum of 3 GPM flow is recommended for the circulation system.

The pump should be sized to overcome the pressure loss through the on demand water heater, optional storage tank, and supply and return plumbing in the circulation loop. Reference the section Pump Sizing for Circulation.

Pump to be of bronze or stainless construc-

tion.On-Demand

Water Heater

Primary

On-Demand

 

Equipment List

QTY

On-Demand

2

Water Heaters

 

Electronic Connection *

*Refer to On-Demand Accessories and Model Applicability for electronic connection details.

On-Demand

Water Heater

Sub 1

Minimum 3/4 “ Hot Water Supply Line

Gas Supply Line

Minimum 3/4 “ Cold Water Supply Line

(Optional) 2-10 Gallon

Storage Tank

(To eliminate cold water

Aquastat Connection

sandwich e ect caused by

 

 

 

 

 

 

 

 

 

 

Expansion Tank

fre quent On/O operation)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Building Outlets

Domestic Hot Water - Circulation Systems

2 On-Demand Water Heater

Optional Piping Installation

Key

3/4" Ball Valve

3/4" Union

Check Valve

Pressure Relief Valve

Pressure Regulator

Circulating Pump

S

Boiler Drain Valve

Solenoid Valve

Mixing Valve

NOTE: This drawing is not intended to describe a complete system and is not a replacement for a pro- fessional engineering drawing. It is intended only as a guide and does not imply compliance with local building code requirements. Confer with local building officials before installation. The Contractor or engineer is to determine the necessary components and configuration of the particular system to be in- stalled. It is the responsibility of the engineer or contractor to ensure that the installation is in accordance with all local building codes.

Drawing Date:

September 07, 2008

Drawing Number:

H-2-RO

27

Page 27
Image 27
A.O. Smith 186965-001, 505 Series 100, 705 Series 100, 305 Series 100 manual Tion.On-Demand Water Heater Primary