Disassembly Procedure Flowchart
The flowchart on the succeeding page gives you a graphic representation on the entire disassembly sequence and instructs you on the components that need to be removed during servicing. For example, if you want to remove the system board, you must first remove the keyboard, then disassemble the inside assembly frame in that order.
Start
Battery |
*2
Middle Cover |
I*4
*2
Wireless LAN |
Cover |
*1
Keyboard |
*4
Wireless LAN |
Cover |
ODD Module |
*3
DIMM/HDD | Memory | |
Cover | ||
|
*4 |
HDD Module |
*4 |
LCD Module |
*1
*13
HDD Bracket | HDD |
Lower Case |
Assembly |
RTC Battery |
Bluetooth |
Module |
*3
Upper Case |
Assembly |
Lower Case |
Main Board | Fan | |
Assembly | ||
|
Upper Case | Touchpad | |
Assembly | ||
|
Speaker Set |
*6 |
| *3 |
| *2 |
|
|
VGA Heatsink | CPU Heatsink | Modem Board |
CPU |
Touchpad |
Bracket |
ODD Module |
Touchpad |
*2
ODD |
ODD Bracket |
Chapter 3 | 45 |