General Information

Pre-disassembly Instructions

Before proceeding with the disassembly procedure, make sure that you do the following:

1.Turn off the power to the system and all peripherals.

2.Unplug the AC adapter and all power and signal cables from the system.

3.Place the system on a flat, stable surface.

4.Remove the battery pack.

Disassembly Process

The disassembly process is divided into the following sections:

External components disassembly

Main unit disassembly

LCD module disassembly

The flowcharts provided in the succeeding disassembly sections illustrate the entire disassembly sequence. Observe the order of the sequence to avoid damage to any of the hardware components. For example, if you want to remove the Mainboard, you must first remove the Keyboard, and LCD Module then disassemble the inside assembly frame in that order.

Main Screw List

Screw

 

Quantity

Part Number

 

 

 

 

M1.98D 4.0L K 4.6D 0.8T ZK

35

 

86.S6802.001

 

 

 

 

M2D 2.5L K 6.5D ZK NL

3

 

86.S6802.002

 

 

 

 

M1.98D 3.0L K 4.6D NI NL

9

 

86.S6802.003

 

 

 

 

M3.0D 3.0L K 4.9D NI

4

 

86.S6802.004

 

 

 

 

M2D 12L K 4.6D NI NL

1

 

86.S6802.008

 

 

 

 

38

Chapter 3

Page 48
Image 48
Acer EM250 General Information, Pre-disassembly Instructions, Disassembly Process, Main Screw List Quantity Part Number