Acer |
|
|
|
|
|
| Acer | ||
|
|
|
|
|
|
|
|
|
|
|
|
| OFF |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ACM | ON |
| OFF |
| |||
|
|
|
|
| |||||
|
| OFF |
| ||||||
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
| VGA |
|
|
| |||
|
| Input |
|
|
|
|
|
| |
|
| DVI |
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| HDMI |
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| EMEA |
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| English | English |
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| Russian | 繁體中文 |
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| Deutsch | Deutsch |
|
| |||
|
|
|
|
|
|
|
|
|
|
|
| Language | Français | Français | English |
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| Español | Español |
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| Italiano | Italiano |
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| Dutch | 简体中文 |
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
| Finnish | 日本語 |
|
| |||
|
|
|
|
|
|
|
|
|
|
|
| Reset |
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
| Resolution |
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
| H. Freq |
|
|
| ||||
| Info |
|
|
|
|
|
| (2) |
|
| V. Freq |
|
| ||||||
|
|
|
|
|
|
|
|
|
|
|
| Input Type |
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
| S/N |
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
Notes: (1) Clock default 50 is for Visa timing. Others depend on timing.
(2) Depend on timing & S/N
6. SOP of firmware upgrade (Manufacturer of Scaler is Mstar)
6.1 Operational condition:
Equipment: PC, ISP card, signal cable and power cable.
ESD requirements: antistatic wrists, antistatic gloves (fingers), and connecting cable
Name of ISP program: ISP_Tool_v3.7.5.exe
Manufacture of FW IC:PMC/SST/MX
6.2Operational steps:
1.Connection: connect PC to PCBA with signal cable, and then keep AC and DC in open state.
10