NO OBSTRUCTIONS ABOVE OR AROUND

5-in-1 Sensor Installation Guidelines

INSTALLATION HEIGHT Mount the sensor at least 5 feet (1.5 meters) off the ground (higher is better for wind measurement) in an open area. Secure to fence post, 2”x 4” wood, 3/4” pole, etc. (not included)

LEVEL INSTALLATION Use the bubble level (included on top of sensor) to ensure level installation for accurate wind measurement.

SOLAR CELL INSTALLATION Install the sensor with the solar cell facing SOUTH. This ensures the cell receives as much sun as possible and orients wind direction.

5-in-1 Sensor Installation

1.Fasten mounting base

(included) to a post or pole

(not included) using the 4 longer screws included in the hardware bag.

2.Insert the mounting base into the hole on the bottom of the

sensor.

3. Make sure the arrows on the

 

 

top of the sensor are pointed

 

 

in the proper direction and

 

 

the bubble level is centered.

(1.5 meters)

The solar cell should be facing

 

 

south to properly orient the

 

 

wind direction.

 

 

4. Fasten the sensor into the mounting base using the 2 shorter screws included in the hardware bag.

The 5-in-1 sensor is now

ready to use.

Clear Data Collected During Installation

When installation is complete, clear erroneous data from the display unit by pressing the “CLEAR TODAY” button, on the back of the display inside the battery compartment. This button will clear data recorded since 12:00 am.

Basic Setup is Complete

The 5-in-1 sensor will now synchronize with the display unit. It may take a few minutes for synchronization to complete. If both or one of the units appear to be functioning improperly, please refer to the troubleshooting section.

12

Page 12
Image 12
Acu-Rite 1010 In-1 Sensor Installation Guidelines, Basic Setup is Complete, Clear Data Collected During Installation