READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE

This fixture is intended for installation in accordance with the National Electrical Code and local regulations. To

assure full compliance with local codes and regulations, check with your local electrical inspector before

installation. To prevent electric shock, turn off electricity at fuse box before proceeding.

Retain these instructions for maintenance reference.

INSTRUCTION SHEET NO.

IS:LAS56

A0402

 

Page 1 of 1

INSTALLATION PROCEDURE FOR: LAS56 AIRSEAL GASKET KIT

WITH 1004, IC, R, ICR, S, SIC, SR, SICR AND 1104, IC, R, ICR, S, SIC, SR, SICR, F1, F1R

LYTENING FRAME-IN-KITS

1.Align bottom edge of HOUSING with CEILING SURFACE (FIG. A) (FIG. D)

Note: STEP 1 Needed for “NEW CONSTRUCTION” HOUSINGS only

2.Apply appropriate size FLANGE GASKET to CEILING SURFACE around edge of HOUSING and bend flaps up into inside surface of HOUSING (FIG. B) (FIG. C)

Note: CEILING SURFACE must be clean and free of dust and debris before applying

FLANGE GASKET

Careful placement is needed to avoid openings that would void airseal rating.

3.Apply 3 SLOT COVERS over slots in “NEW CONSTRUCTION” HOUSING or over spring openings in “REMODELER” HOUSING (FIG. B) Note: SLOT COVERS are not needed in “NEW CONSTRUCTION” HOUSING if the HOUSING didn’t need to be adjusted vertically to align with the CEILING SURFACE and knock-outs are in the slots

HOUSING

CEILING

FIG A

FLANGE

FIG B

SLOT

GASKET

 

COVER

(1104 SERIES)

 

 

(1004 SERIES)

 

 

.

NEW

CONSTRUCTION

 

HOUSING

FLANGE

FLANGE

. REMODELER. HOUSING

CEILING

FIG C

GASKET

CEILING

GASKET

 

SURFACE

 

SURFACE

FIG D

A COMPANY

631 Airport Road, Fall River, MA 02720

Page 1
Image 1
Lightolier instruction sheet ISLAS56, Installation Procedure for LAS56 Airseal Gasket KIT, Lytening FRAME-IN-KITS