ADCP-61-471 • Issue 4 • June 2000 • Section 2: Operation and Maintenance

NTP-002

Page 2 of 3

Do Items Below in the Order Listed

For Details Go To

5.

Familiarize yourself with the Soneplex Broadband chassis, module

 

 

locations, and wiring points.

DLP-501

6.

Verify that –48 VDC is present at the power supply terminal block

 

 

located on the chassis backplane.

DLP-508

7. If specified in the work order, install and test the MPU module:

Install a new MPU module in a non-provisioned chassis, and verify

stand-alone operation.

DLP-502

Remove an MPU from an existing chassis, install it in another chassis,

and verify stand-alone operation.

DLP-519

8. Install and test APU module.

DLP-503

9.Install and test the working DS3 MUX module in the MXW slot of the Soneplex Broadband chassis. If required, install the protect DS3 MUX in the MXP slot. In an unprotected system, the DS3

 

MUX module must be installed in the working slot.

DLP-505

10.

Install and test Version C, D, E, or G HLXC module(s).

DLP-516

11.

Perform end-to-end tests between the HLXC and the HLXR.

DLP-520

12.

Install and test DLX module(s).

DLP-521

13.

Perform DLX-equipped circuit end-to-end tests.

DLP-522

14a. Install and test RLX module(s).

DLP-525

 

AND/OR

 

14b.

Install and test RLXIOR module(s).

DLP-524

15.

Perform RLX-equipped circuit end-to-end tests.

DLP-522

16.Install and test ODS2 module(s). Install the Working ODS2 module first, then the Protection module. In an unprotected system,

the ODS2 module must be installed in the working slot.

DLP-506

17. Install and test the Remote Test Access Unit (RTAU).

DLP-517