Install the cable conduit from below and position it so that the top of each upward bend will be located within the PMF opening at the indicated point. When installed, the top of the conduit should be located 1 to 2 inches (2.54 to 5.08 cm) below the top of the finished concrete pad. Install the conduit before pouring the pad.
36.8IN.
(93.5 CM)
|
| 17.5 IN. |
| |
|
| (44.5 CM) |
| |
| 4 IN. DUCT FOR | 12.5 IN |
| |
| FEEDER CABLE | (31.8 CM) |
| |
| (LOCATE 1 - 2 INCHES | 8.0 IN. |
| |
| BELOW TOP OF PAD) |
| ||
| (20.3 CM) |
| ||
|
|
| ||
GROUND ROD |
| 8.0 IN. |
| |
| (20.3 CM) |
| ||
(LOCATE 1 - 2 INCHES |
| 11.75 IN. |
| |
BELOW TOP OF PAD) |
|
| ||
| (29.8 CM) |
| ||
|
|
| ||
| DO NOT POUR | 4 IN. DUCT FOR |
| |
| DISTRIBUTION CABLE | |||
| CONCRETE INSIDE | |||
| (LOCATE 1 - 2 INCHES | |||
| PAD MOUNT FRAME | |||
| BELOW TOP OF PAD) | |||
PAD MOUNT FRAME | CABINET FRONT | |||
|
| |||
CAST IN PLACE |
|
|
| |
|
|
| 38.6 IN. | |
|
| 18.0 IN. | (97.9 CM) | |
|
| (45.7 CM) |
| |
REINFORCED |
|
|
| |
CONCRETE PAD |
|
|
|
TOPSOIL OR
TOP OF PMF SHOULD BE
6.0 IN.FLUSH WITH TOP OF CONCRETE DECORATIVE ROCK
(15.2 CM)
|
|
|
|
|
|
|
|
|
| GRADE |
|
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
| 90º BEND | |
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |||
|
|
|
| GRAVEL OR EQUIVALANT FILL |
|
|
| IN DUCT | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| COMPACTED SOIL |
|
|
|
|
| ||
4.0 IN. MIN. |
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
| ||||
(10.2 CM) |
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
Page 4
© 2007, ADC Telecommunications, Inc.