ADCP-96-123 • Issue 1 • May 2007

Install the cable conduit from below and position it so that the top of each upward bend will be located within the PMF opening at the indicated point. When installed, the top of the conduit should be located 1 to 2 inches (2.54 to 5.08 cm) below the top of the finished concrete pad. Install the conduit before pouring the pad.

36.8IN.

(93.5 CM)

 

 

17.5 IN.

 

 

 

(44.5 CM)

 

 

4 IN. DUCT FOR

12.5 IN

 

 

FEEDER CABLE

(31.8 CM)

 

 

(LOCATE 1 - 2 INCHES

8.0 IN.

 

 

BELOW TOP OF PAD)

 

 

(20.3 CM)

 

 

 

 

GROUND ROD

 

8.0 IN.

 

 

(20.3 CM)

 

(LOCATE 1 - 2 INCHES

 

11.75 IN.

 

BELOW TOP OF PAD)

 

 

 

(29.8 CM)

 

 

 

 

 

DO NOT POUR

4 IN. DUCT FOR

 

 

DISTRIBUTION CABLE

 

CONCRETE INSIDE

 

(LOCATE 1 - 2 INCHES

 

PAD MOUNT FRAME

 

BELOW TOP OF PAD)

PAD MOUNT FRAME

CABINET FRONT

 

 

CAST IN PLACE

 

 

 

 

 

 

38.6 IN.

 

 

18.0 IN.

(97.9 CM)

 

 

(45.7 CM)

 

REINFORCED

 

 

 

CONCRETE PAD

 

 

 

TOPSOIL OR

TOP OF PMF SHOULD BE

6.0 IN.FLUSH WITH TOP OF CONCRETE DECORATIVE ROCK

(15.2 CM)

 

 

 

 

 

 

 

 

 

 

GRADE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90º BEND

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GRAVEL OR EQUIVALANT FILL

 

 

 

IN DUCT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMPACTED SOIL

 

 

 

 

 

4.0 IN. MIN.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(10.2 CM)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

21936-A

 

 

 

 

 

 

 

 

 

 

 

 

Figure 2. Constructing the Concrete Pad for the FDH 3000 Small Size Cabinet