A template is provided with the cabinet isolation gasket. The template may be used to determine the cable conduit locations. Place the template over the top of the PMF and align the top right corner of the template with the top right corner of the PMF as shown in Figure 3. The holes punched in the template show the locations for the conduit within the PMF.
|
| |
LOCATION OF |
| |
LOCATION OF FEEDER | DISTRIBUTION |
|
CABLE CONDUIT | CABLE CONDUIT | ALIGN EDGES OF |
|
| |
|
| TEMPLATE WITH |
|
| EDGES OF PMF |
FRONT OF
PLACE CARDBOARD
TEMPLATE OVER
TOP OF PMF
CABINET
Figure 3. Using the Template To Determine Duct Location Within the PMF
4 CONCRETE PAD CONSTRUCTION
Use the following procedure to construct the concrete pad:
1.Build a wood form for the concrete pad using 2 x 6 framing lumber as shown in Figure 4.
2.Locate the PMF using the dimensions provided in the construction diagram (see Figure 2). When installed, the top surface of the PMF must be flush and level with the top of the concrete pad.
Note: Use temporary top framing to keep the top surface of the PMF flush and level with the top of the concrete pad (see Figure 4) while the concrete is poured.
3. Place reinforcing material inside the form but outside of the PMF.
Page 5