132996260.qxd 7/24/01 9:12 PM Pagina 43

(Nero/Process Black pellicola)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Installation

Unpacking

All transit bolts and packing must be removed before using the appli- ance.

Using a spanner, unscrew and remove the rear right-hand bolt and lay the machine on its back, taking care not to squash the hoses. This can be avoided by placing one of the corner packing pieces between the machine and the floor.

P025

Remove the poly- styrene base and take off the bot- tom panel by unscrewing the central screw.

Carefully slide out the right poly- thene bag.

Repeat the opera- tion for the left and central poly- thene bags.

Re-fit the bottom panel using the 4

screws supplied with the door hinges (in the plas- tic bag) and the

previously removed screw.

43

Page 43
Image 43
AEG 10500 VI manual Installation, Unpacking, Carefully slide out the right poly- thene bag, Previously removed screw