Supply Options
Display | Supply |
|
|
SUP0 | No Supply |
|
|
SUP1 | Supply 1 |
|
|
SUP2 | Supply 2 |
|
|
SUP3 | Supply 3 |
|
|
SUP5 | Supply 1 and 2 |
|
|
SUP6 | Supply 2 and 3 |
|
|
8.Press the Start key.
9.Use the Up or Down key to select the desired spin time. Set this value to zero to skip the spin step.
10.Press the Start key. The display will show the identifier for next program segment or cycle option. If the edited segment is the final (Fill 6) segment in the cycle, the display will show the cycle number.
Note: Every intermediate spin is followed by a
11.Press the Stop key at any time to complete the cycle programming procedure.
Test Cycle
When program mode is first entered, the display shows temperature. To enable the factory test cycle, press the Down key. The display will read “tESt.”
Programming
To run the test cycle, proceed as follows:
1.Enter RUN mode by moving the PROGRAM/RUN mode toggle switch back to the down position.
2.Verify that the RUN/PROGRAM mode toggle switch is in the RUN position.
3.To run the test cycle, enter the required number of coins and press the Start key.
The test cycle is as follows:
a.Once the Start key is pressed, the door interlock engages, the drain valve closes, the cylinder begins agitating at wash speed, and both water inlet valves are energized. The display alternately flashes “bFIL” and “LO” (both hot and cold fill valves on, filling to low level).
b.The display continues flashing “bFIL” and “LO” (both hot and cold fill valves
c.When low water level is reached, the
display flashes “CFIL” and “ ned” (cold fill valve
d.When medium water level is reached, the display flashes “HFIL” and “HI” (hot fill valve
25
F232061