Alto-Shaam 750-TH-II manual STAcKING INSTrucTIONS, Stacking Configurations

Models: 750-TH-II

1 28
Download 28 pages 26.37 Kb
Page 9
Image 9

i n s t a l l a t i o n

s i t e INSTALLATION

STAcKING INSTrucTIONS

1)If the two appliances were shipped together from the factory, the top unit will have the casters already removed. A stacking kit will be included with the shipment.

If casters need to be removed: lay the unit on its back, and remove the set screw on each caster. Pull the casters out of the unit.

2)While appliance is laid on its back, insert one stacking post in each of the four corners of the upper unit. Secure the stacking posts using one screw and two flat washers that come with the stacking kit.

Note: The flange on the stacking posts must face the outside of the unit.

3)remove the four top mounting screws from the lower unit. place the upper appliance, which has the stacking posts installed, on top of the bottom unit. center the top unit from front to back. re-install the four screws through the flange of the four stacking posts.

STACKING

POSTS

CASTER SET SCREW

TOP

MOUNTING

SCREWS

TOP

MOUNTING

SCREWS

Stacking Configurations

1000-TH-II with 1000-TH-II, 1000-SK-II, 1000-SK/III or 1000-S,750-TH-II with 750-TH-II, 750-TH/III, 750-S, 767-SK or 767-SK/III, 500-TH-II with 500-TH-II, 500-TH/III or 500-S

TH-IIseries installation/operation/service manual - pg. 7

Page 9
Image 9
Alto-Shaam 750-TH-II manual STAcKING INSTrucTIONS, Stacking Configurations