21
The neutral will only be used on 4-wire service. This is typical for 380-416V, 50 Hz.
A ground lug is provided in the rear electrical box to connect your service ground.
b. 3-Phase (3ø) Wiring Connections/Hookup
The electrical connections on ALL 3-phase (3ø) gas and steam dryers are made into the rear service
box located at the upper left area of the dryer. The electrical connections are made at the power
distribution block located in the service box. The ground connection is made to the copper lug, also
provided in this box. To gain access, the service box cover must be removed.
FOR 110V APPLICATIONS FOR 208-230/240V APPLICATIONS