Disconnecting the load from the PDU(s)

Disconnecting the load from the PDU(s)

The UPS must be connected to either a dry contact or a 24 VDC

Pin connections J106 (UPS)

To disconnect the load, set the applicable breaker to the OFF position.

PDU output breaker ratings

 

Ambient temperature

 

 

 

Rear of unit

in front of unit ºC

Nominal rating of breaker

 

 

20

50

63

 

 

 

 

 

Free exhaust

20

17

42.5

53.55

Free exhaust

30

16

40.0

50.40

Free exhaust

40

15

37.5

47.25

Hot aisle exhaust

25

16

40.0

50.40

EPO switch.

Note

Always follow the pin connection procedures from the top and work down: J106 (8-1), J108 (1-6).

Note

EPO (Emergency Power Off) switch wiring – pin connections J108 (for EPO wiring options)

Connect the EPO cable, using one of the following 4 wiring configurations:

J106

8

7

6

5

4

3

2

1

Charging control switch

Q3 switch

4

3

2J200 (XR Batteries)

Pins 1 to 4 are for battery measurement (only applicable to APC XR Battery Enclosures).

Pins 5 and 6 are for external maintenance bypass Q3 (auxiliary switch N/C type).

When Q3 is closed, signals are fed back to the UPS controller.

Pins 7 and 8 are for external charge control. When 7 and 8 are closed, the UPS charges batteries with a pre-defined percentage (0-25- 50-75-100%) of the maximum charging power. To be used in generator applications, or if special codes requires control of charging. When Q3 is closed, signals are fed back to the UPS controller.

5 Communication Cables

J108

 

 

 

 

 

1

 

 

 

 

 

 

 

 

EPO circuit

 

 

 

 

 

2

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1: Dry Contracts Normally Open

EPO is activated when pin 1 is connected to pins 3 and 5.

Prewired connection 2-4-6, 3-5 and 1 => Pin connections J106 (UPS)PDU output breaker ratings

When connecting the Q3 auxiliary signal, use gold-plated N/C auxiliary switch on Q3.

Note

Reinstall cable landing covers.

Note

Emergency Power Off (EPO) switch must be connected to a NEC Class 2 circuit.

Use only 28-16 AWG copper wire for the connection of the EPO switch and other optional equipment. Keep all other

J108

1EPO circuit

3

4

5

2: +24V Normally Open

EPO is activated when an isolated SELV 24VDC voltage is supplied on pin 1 with reference to pin 2.

Prewired connection 3-5 and 4-6

Note

Connection of APC communication options – PowerChute software and temperature sensor (identical cable routing)

Note

Note

Note

wiring and uninsulated live parts separate of other NEC Class 2 circuits.

Do not connect any circuits to the EPO terminal block unless it can be confirmed that the circuit is a NEC Class 2 circuit.

Remove top cable landing covers as described under Battery Cable Landings, top entry.

6

J108

1

2

35 Communication Cables EPO circuit

5

6

J108

1

2

3

EPO circuit

3: Dry Contacts Normally Closed

EPO is activated when a connection from pin 3 to pin 5 is opened.

Prewired connection 4-6.

4: +24V Normally Closed

EPO is activated when a SELV 24VDC voltage removed from pin 3 with reference to pin 4.

Temperature sensor/

 

 

 

 

PowerChute software

 

Temp.

 

 

 

 

sensor

 

 

 

 

Power

 

 

 

 

Chute

 

! Output Pwr

Zone

Probe

 

 

 

 

 

10/100Base-T

 

Reset

 

 

 

 

 

 

 

10/100

 

 

 

AP9619

Network Management Card EM

 

 

 

 

 

 

 

 

 

 

Open front door.

Feed cables from optional communication equipment through the opening in the top cover.

Guide the cables along the inside of the left side panel down to the opening in the power module frame.

J106 Pin Connections:

8Ext. charging control return

7External control of charging

6Q3 active return

5Q3 active

4Battery measurement supply*

3Battery unit quantity*

2Max. battery temperature*

1Battery measurement return*

*Should be used with APC XR Enclosures

1: Dry Contracts Normally Open J108 Pin Connections:

1Normally open EPO

2Normally open EPO return

3Normally closed EPO

4Normally closed EPO return

5+24V SELV supply

6SELV ground

4

5

6

Connect communication equipment where shown.

The APC communication options are provided at the front of the UPS.

Note

Smart-UPS® VT ISX w/transformer and PDU, 20-30 kVA, 480 V, Installation

Smart-UPS® VT ISX w/transformer and PDU, 20-30 kVA, 480 V, Installation

Page 3
Image 3
American Power Conversion 20-30 kVA 480V Communication Cables, Disconnecting the load from the PDUs, 2 +24V Normally Open