44 AIS® 3000 10-40kVA, 400V, Site Preparation and Installation Manual – 990-2258
Floor Anchoring (option)
Floor anchoring of stand-alone sy stems
In earthquake areas, it is recommended that the installation be bolted to the floor, and that the
batteries be secured in the Enclosure by the Battery Securing Brackets.
For floor anchoring, use the 2 transport brackets that were used to secure the UPS to the pallet
during transport.
Align the 4 holes in the bottom angle of the Floor Anchoring Bracket on either side of the UPS
to the pre-drilled holes in the floor
Floor anchoring is an option. If your installation does not include this option,
proceed to the Front Panel Installation section.
Floor anchoring procedures identical for both 352mm and 523mm UPS Enclosures.
See Floor Anchoring Preparation section and install a minimum of 4 anchors on each
Enclosure (minimum size: M8) where shown, following the specifications provided by the
manufacturer.
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Floor Anchoring Bracket
(re-use of transport
bracket)