American Power Conversion SUA48RMXLBP3U Maintenance and Service, Replacing the Battery Module

Models: SUA48RMXLBP3U

1 8
Download 8 pages 33.88 Kb
Page 6
Image 6
Setting the UPS to Recognize the Battery Pack(s)

Setting the UPS to Recognize the Battery Pack(s)

Smart-UPS XL models must be programed for the appropriate number of external battery packs in one of two ways.

PowerChute® Business Edition

Optional accessory cards

Refer to the instructions included with the software or accessory cards.

This configuration affects the accuracy of the predicted runtime calculations the UPS performs while running on battery power.

Maintenance and Service

Replacing the Battery Module

This unit has two easy-to-replace, hot-swappable battery modules. Replacement is a safe procedure, isolated from electrical hazards. You may leave the external battery pack and connected equipment on during the replacement procedure.

Once the batteries are disconnected the connected equipment is not protected from power outages.

Refer to the appropriate replacement battery user manual for battery module installation instructions. See your dealer or contact APC at www.apc.com or htpp://upgrade.apc.com for information on replacement battery modules.

Be sure to deliver the spent battery(s) to a recycling facility or ship it to APC in the replacement battery packing material.

Service

If the unit requires service do not return it to the dealer. Follow these steps:

1.If the problem persists, contact APC Customer Support through the APC Web site, www.apc.com.

Note the model number of the unit, the serial number located on the back of the unit, and the date purchased. If you call APC Customer Support, a technician will ask you to describe the problem and attempt to solve it over the phone. If this is not possible, the technician will issue a Returned Material Authorization Number (RMA#).

If the unit is under warranty, repairs are free.

Procedures for servicing or returning products may vary internationally. Refer to the APC Web site for country specific instructions.

2.Pack the unit in its original packaging. If this is not available, refer to www.apc.com for information about obtaining a new set.

Pack the unit properly to avoid damage in transit. Never use Styrofoam beads for packaging. Damage sustained in transit is not covered under warranty.

Always DISCONNECT THE BATTERY before shipping in compliance with U.S. Department of Transportation (DOT) and IATA regulations. The battery(s) may remain in the unit.

3.Mark the RMA# on the outside of the package.

4.Return the unit by insured, prepaid carrier to the address given to you by Customer Support.

SUA48RMXLBP3U External Battery Pack User Manual

6

Page 6
Image 6
American Power Conversion SUA48RMXLBP3U user manual Maintenance and Service, Setting the UPS to Recognize the Battery Packs