Installation
Instructions
T O W N S Q U A R E | 2555.602 |
P R E S S U R E B A L A N C I N G B AT H A N D
S H O W E R - B u i l t - i n D i v e r t e r f o r T U B F I L L E R
Thank you for selecting
To ensure that your installation proceeds
|
|
|
|
| Certified to comply with ANSI A112.18.1 | |
|
|
|
|
|
| M968789 Rev. 1.5 |
Required Tools |
|
|
|
| ||
| To assure proper positioning in relation to wall, note |
|
| |||
|
|
|
|
| ||
| FINISHED WALL |
|
|
| ||
Phillips Screwdriver |
|
|
|
| ||
| 1 |
|
|
|
| |
|
|
| 1/2" I.P.S. |
|
| |
|
|
|
|
|
| |
| 2" REF. |
|
| OPTIONAL TO |
|
|
Flat Blade Screwdriver |
|
|
|
|
| |
|
|
| FINISHED FLOOR |
|
| |
|
|
|
| USUALLY BETWEEN |
|
|
|
|
|
| 65'' AND 78'' |
|
|
|
| 8" REF. |
|
|
| OUTLETS 1/2" NPT |
| 74" FOR |
|
|
|
|
|
| HEAD CLEARANCE |
|
|
|
|
|
Plumbers' Putty or Caulking |
|
| SHW | "SEE ILLUSTRATION" |
| |
|
|
|
| |||
|
|
| ||||
|
|
|
|
| ||
|
|
| TUB |
|
|
|
| 18" |
|
|
|
|
|
| OPTIONAL |
|
|
|
| |
|
|
|
|
| ||
Channel Locks |
|
|
|
|
| |
|
|
|
|
|
| |
|
|
| 1/2" COPPER | INLETS | ||
| TOP OF | 4" | 1/2" NPT | THREADED INLETS (STOPS) | ||
|
|
|
| |||
| TUB RIM |
|
|
|
|
|
Adjustable Wrench | BOTTOM OF |
|
|
|
| |
| TUB |
|
|
|
|
|
1 |
|
|
| |||
CAUTION | Turn off water at main supply. |
| ||||
|
|
|
|
|
| |
|
|
| When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering, |
| ||
|
|
| ||||
| NOTE | 5 | ||||
|
|
| flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread |
sealant or Teflon tape on threaded connections. | 7 |
|
See
1/2" female NPT for threaded inlets Connect RISER PIPE (1) to MANIFOLD (2) top outlet marked "SHR".
Connect TUB FILLER PIPE (3) at bottom outlet marked "TUB".
For proper positioning the finished wall must be within side wall of PLASTER GUARD (4).
If the valve is installed on a fiberglass or other thin wall application, the
PLASTER GUARD (4) can be used as a support. Cut a 4" dia. hole in the shower stall.
Drill two additional 1" holes to allow access to the stops.
Remove PLASTER GUARD (4), rotate 180˚
so that indicated screw holes fit MANIFOLD (2). Push CAP on valve, place ESCUTCHEON on and
attach with screws.
Connect hot and cold water supplies.
1
2 COLD 4 HOT
3
Cap off shower pipe (5) and tub filler pipe (6). | 6 | |
For support, use pipe BRACES (7) secured to wooden braces. | ||
|
With valve turned off, turn on water supplies. Check for leaks.