INSTALLATION AND FRAMING INSTRUCTIONS
Locate studs as required. Ensure
NOTE: The apron may be used as the primary access opening.
1.As shown in Fig. 1, mark the position of the underside of the deck by tracing a line onto the studs at the height indicated, using a level or other suitable straight edge.
2.With the top of the stringer touching the traced line, attach the stringer to the studs.
3.Install drain components to the whirlpool or bath following the manufacturers instructions. See the
4.THIS BATH MUST BE SUPPORTED ALONG ITS ENTIRE BOTTOM. We recommend the use of mortar as bedding material (sand is not recommended). Apply enough bedding to support the complete bottom of the bath. After the bedding has been poured, and before it sets, position whirlpool or bath within recess until the rim is leveled against the leveling stringers (see "Typical Recess Installation") shown below. The rim of the bath MUST NOT support weight. Allow the bedding material to completey harden before applying weight to the rim or bottom of the bath. Any finish material such as tile or wall board must be
FIG. 1
(502mm)
TYPICAL RECESS INSTALLATION
SUGGESTED WHIRLPOOL/BATH INSTALLATION METHOD
WOOD STUDS
STUD
WATERPROOF DRYWALL
OR CEMENT BOARD
TILE
ROOFING NAIL
SEALANT
TUB
1 x 3 (25 x 76mm) WOOD STRINGER FULL LENGTH
STEEL STUDS
|
|
|
|
|
| |
(502mm) |
| 0 |
| ) |
|
|
| 3 |
|
|
| ||
|
|
| m |
|
| |
|
| m | 2 |
| ||
|
| 2 |
| ) | ||
|
| 6 |
| 3 |
| |
| 7 |
|
| m | ||
| ( |
|
|
|
| |
|
|
|
|
| m | |
|
|
|
| 3 |
| |
|
|
|
| 1 | WIDTH | |
|
|
| 8 |
|
| |
|
|
| ( |
|
|
|
60 |
|
| TUB |
|
| |
(1524mm) |
|
| LEVELING | |||
|
|
|
STRINGERS
STEEL
STUD
WATERPROOF DRYWALL OR CEMENT BOARD
TILE
SEALANT
TUB
WASHER
4" (102mm)
DRYWALL SCREW
34 Typ.
(864mm)
1 x 3 (25 x 76mm) WOOD STRINGER FULL LENGTH
SECURE THE BATH TO THE STUDS
AS SHOWN FOR WOOD OR STEEL STUD
CONSTRUCTION.