American Standard 4501 installation instructions Installation Instructions, 4 5 0 4 5 0 1 S

Models: 4501

1 2
Download 2 pages 16.46 Kb
Page 1
Image 1
SYMPHONY

SYMPHONY

PRESSURE BALANCING BATH AND SHOWER TRIM KITS

Installation Instructions

4 5 0 1

4 5 0 1 S

Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years.

To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.

Certified to comply with ANSI A112.18.1

M968805 REV. 1 . 4

ROUGHING-IN DIMENSIONS

 

 

To assure proper positioning in relation

 

 

to wall, note roughing-in dimensions.

1-5/8" TO 3-1/4"

 

 

 

FINISHED WALL

1/2" NPT

 

 

 

3-5/8" REF.

OPTIONAL TO FINISHED

 

 

 

 

FLOOR USUALLY

 

 

BETWEEN 65'' AND 80''

INLETS 3-3/8"

 

 

5-1/2" REF.

 

SHR. 1/2" NPT

 

 

"SEE ILLUSTRATION "

 

 

74" FOR HEAD

 

3-3/8"

 

INLETS 1/2" NPT

CLEARANCE

 

 

 

6-3/4"

 

18" OPTIONAL

 

TUB PORT 1/2" NPT'

 

 

3-5/8"

 

THREADED INLETS

 

 

5-1/8" REF.

1/2" NPT''

 

4"

 

 

 

TOP OF TUB RIM

 

 

BOTTOM OF TUB

 

 

1

ROUGHING-IN

CAUTION Turn off water at main supply.

 

 

5

NOTE When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering,

7

 

flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread

 

sealant or Teflon tape on threaded connections.

 

See Roughing-in diagram before starting. Connections are:

PRESSURE BALANCING BATH AND SHOWER TRIM KITS 1/2" female NPT for threaded inlets Connect RISER PIPE (1) to MANIFOLD (2) top outlet marked "SHR".

Connect TUB FILLER PIPE (3) at bottom outlet marked "TUB".

For proper positioning the finished wall must be within side wall of PLASTER GUARD (4).

If the valve is installed on a fiberglass

1

or other thin wall application, the

 

PLASTER GUARD (4) can be used as a support.

2

 

Cut a 4" dia. hole in the shower stall.

 

 

Drill two additional 1" holes to allow access

HOT

 

 

 

to the stops.

 

Remove PLASTER GUARD (4), rotate 90˚

 

 

 

 

 

 

so that indicated screw holes fit MANIFOLD (2).

 

 

Push CAP on valve, place ESCUTCHEON on and

3

 

 

 

attach with screws.

 

Connect hot and cold water supplies.

 

Cap off shower pipe (5) and tub filler pipe (6).

 

For support, use pipe BRACES (7) secured to wooden braces. With valve turned off, turn on water supplies. Check for leaks.

COLD

6

4

Page 1
Image 1
American Standard 4501 installation instructions Installation Instructions, 4 5 0 4 5 0 1 S, Symphony