American Standard 5030.LBW installation instructions BMake connections to supply and drain lines

Models: 5030.LBW

1 7
Download 7 pages 57.25 Kb
Page 6
Image 6
B)Make connections to supply and drain lines.

6

Install temporary braces to hold the center of the back and side panels tight to the studs for approximately 24 hours while adhesive sets. Add cushioning between panels and braces to prevent scratching the panels.

7

When installing greenboard, position drywall screws above the top nailing flange. If you choose to screw through the nailing flange, you MUST drill clearance holes in the flange to avoid cracking/damaging the flange.

8

A)After greenboard is installed, apply finished latex/acrylic caulk bead to all edges and joints. Follow caulk manufacturers’ recom- mended cure time.

B)Make connections to supply and drain lines.

6

753846 - 100 Rev . C

Page 6
Image 6
American Standard 5030.LBW installation instructions BMake connections to supply and drain lines