American Standard 6022 installation instructions Installation, Ariana, Instructions, 6021

Models: 6022 6021

1 4
Download 4 pages 61.67 Kb
Page 1
Image 1
Installation

 

Installation

ARIANA

Instructions

6021

IN WALL PRESSURE BALANCING

6022

BATH AND SHOWER SETS

Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years.

To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.

O

ff

 

H

o

t

 

 

 

 

 

 

 

 

Certified to comply with ANSI A112.18.1

 

 

 

 

 

 

M 9 6 8 4 5 7 B

ROUGHING-IN DIMENSIONS

 

Required Tools

 

 

 

 

To assure proper positioning in relation to wall,

 

 

 

 

 

note roughing-in dimensions.

 

Phillips Screwdriver

 

Flat Blade Screwdriver

 

FINISHED WALL

 

 

 

 

 

 

 

 

 

 

 

 

Adjustable Wrench

 

 

1/2" NPT

 

 

 

 

 

 

 

 

Plumbers' Putty or Caulking

 

 

5-1/8" REF.

 

 

 

 

 

 

 

 

 

1-5/8"

 

 

 

Channel Locks

 

 

to

 

 

 

 

 

 

 

3-1/4"

 

 

 

 

 

 

7-7/8" REF.

OPTIONAL TO FINISHED

 

 

 

 

 

 

FLOOR USUALLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BETWEEN 65'' AND 80''

 

 

 

 

 

74" FOR HEAD

 

INLETS 1/2" NPT

OUTLETS

 

 

 

 

 

 

 

CLEARANCE

 

3-3/8"

 

1/2" NPT

5-7/8"

INLETS

 

 

 

 

 

 

 

7-1/8"

 

 

 

 

1/2" NPT

 

 

 

 

 

 

 

 

 

3-3/8"

 

 

 

 

 

18" OPTIONAL

OUTLETS

 

3-3/8"

 

 

 

 

 

 

 

 

4-1/4"

1/2" NPT

 

 

 

 

 

 

REF.

 

 

 

 

 

 

 

 

THREADED INLETS

 

THREADED INLETS (STOPS)

 

 

4"

 

 

 

 

 

TOP OF TUB RIM

5" REF.

1/2" NPT

 

 

 

 

 

 

 

 

 

 

 

 

 

BOTTOM OF TUB

 

 

 

 

 

 

1

 

 

 

ROUGHING-IN

CAUTION

Turn off water at main supply.

 

 

NOTE When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering, flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread sealant or Teflon tape on threaded connections.

5

7

See Roughing-in diagram before starting. Connections are:

ARIANA 1/2" female NPT for threaded inlets Connect RISER PIPE (1) to MANIFOLD (2) top outlet marked "SHR".

Connect TUB FILLER PIPE (3) at bottom outlet marked "TUB".

For proper positioning the finished wall must be within side wall of PLASTER GUARD (4).

1

 

 

If the valve is installed on a fiberglass

 

 

 

or other thin wall application, the

 

 

 

PLASTER GUARD (4) can be used as a support.

2

 

 

 

Cut a 3" dia. hole in the shower stall.

 

 

 

 

 

 

 

 

 

 

 

Drill two additional 1" holes to allow access

HOT

 

 

 

 

 

 

 

 

 

to the stops.

 

 

 

 

 

 

 

Remove PLASTER GUARD (4), rotate 90˚

 

 

 

 

 

 

 

 

 

 

 

 

so that indicated screw holes fit MANIFOLD (2).

 

 

 

 

Push CAP on valve, place ESCUTCHEON on and

3

 

 

 

 

 

 

 

 

 

attach with screws.

 

Connect hot and cold water supplies.

Cap off shower pipe (5) and tub filler pipe (6).

For support, use pipe BRACES (7) secured to wooden braces. With valve turned off, turn on water supplies. Check for leaks.

COLD

4

6

Page 1
Image 1
American Standard 6022 installation instructions Installation, Ariana, Instructions, 6021, In Wall Pressure Balancing