Installation Instructions
GREEN TEA | T010.740 |
CENTRAL THERMOSTAT
WITH VOLUME CONTROL
TRIM KIT
Thank you for selecting
To ensure that your installation proceeds smoothly please read these instructions carefully before you begin.
Certified to comply with ANSI A112.18.1M
ASSE 1016
M 9 6 8 0 2 2
ROUGHING-IN DIMENSIONS
200mm
R520
1/2" NPT INLETS
or
R540
3/4" NPT INLETS
150mm
(6)
186mm
NOTE: FITTING | 25mm | |
(1) | ||
MUST BE INSTALLED | ||
| ||
WITH VOLUME CONTROL | ||
ON TOP. |
|
FINISHED
WALL
100mm
48mm to 68mm
(2 to
Recommended Tools
Flat Blade Screwdriver | Phillips Screwdriver |
CARE INSTRUCTIONS:
To keep your new faucet looking new, please follow these simple care instructions:
DO: Simply rinse the faucet clean with clear water. Dry the faucet with a soft cotton cloth.
DO NOT:
Do not use any abrasive cleaners, cloths, or paper towels.
Do not use any cleaning agents containing acids, polish abrasives, or harsh cleaners or soaps.
Regular and routine cleaning will reduce the need for heavy cleaning and polishing. If heavy cleaning is required, the following procedures are recommended:
Remove as much surface dirt and film using clear water and soft cotton cloth (as described above).
Use any of the following to remove tough surface film and
Mild liquid detergents
Clear ammonia free liquid glass cleaners
Once clean, rinse faucet again with clear water to thoroughly remove cleaner or polish and blot dry with a soft cotton cloth.
Failure to follow these care instructions may damage the Faucet's finish.