1

 

 

DO NOT SOLDER DIRECTLY TO THE VALVE BODY; THIS WILL DAMAGE

 

ROUGHING-IN THE VALVE

WARNING

 

THE TEMPERATURE CONTROL ELEMENT AND CHECK STOP VALVES.

MIXED

 

Prepare water supplies per ROUGHING-IN DIMENSIONS. Make sure the finished wall is between the minimum and maximum rough dimension.

Install VALVE at indicated height and depth. Make sure the "TOP" marking on the PLASTER GUARD is up.

Connect the hot and cold water supplies. Assemble all connecting pipes. Flush lines to

 

remove any dirt. Connections are 1/2" NPT.

HOT

Assemble the connection pipe to one of the MIXED OUTLETS of the VALVE.

WOOD

Cap the other MIXED OUTLET. (Tub port is fitted with a plug at the factory).

BRACE

IMPORTANT! INSTALL ANY REQUIRED SHUT OFF OR DIVERTER VALVES

COLD

INTO THE PIPING SYSTEM.

1

 

If the CHECK STOPS (4, 5) were removed during installation,

 

ensure the hot and cold CHECK STOPS (4, 5) are not reversed. The

 

hot CHECK STOP (4) has a red top and the cold CHECK STOP (5)

 

has a blue top.

 

COLD

T

OP

 

PLUG TUB

PORT

5 CHECK STOP

CHECK STOPS (4,5) are supplied in the open position. Closing using 5/32" (4 mm) hex wrench to pressure test and to check for leaks.

To flush lines, remove the CHECK STOPS (4,5) and run water. If desired, the TEMPERATURE CONTROL UNIT can be removed. Reinstall CHECK STOPS (4,5) and CONTROL UNIT (6), if it was removed.

Remove PLASTER GUARD (2) if still installed. Turn on water supplies and check for leaks.

Reassemble PLASTER GUARD (2) and FINISH WALL.

Beware of Freezing. No water should remain in the MIXING VALVE if freezing is a possibility. Remove the CHECK STOPS (4,5) to completely drain the MIXER UNIT (1).

HOT

6

3

2

PLUG TUB PORT

CHECK STOP 4 (HOT RED)

(COLD BLUE)

TOP

2 TEMPERATURE ADJUSTMENT

Unscrew PLASTER GUARD SCREWS and remove PLASTER GUARD.

ARROW

BLACK CLAMP

Check that arrow marking B points vertically upwards. If not, push the BLACK CLAMP on the SECURING RING to the right, pull off KNOB MOUNT and reinstall KNOB MOUNT with arrow "B" pointing upwards.

"B"

The maximum mixed water temperature is set at 109 F at the factory.

TEMPERATURE

 

This setting can be changed if desired.

 

LIMIT STOP

104

 

ARROW

"A"

KNOB

Remove the TEMPERATURE LIMIT STOP (H shaped Black Plastic part). Reinstall it at the desired notch as indicated in the diagram to limit the maximum mixed water temperature to 104 F or 112 F.

For 100 F adjustment, turn the water supply on. Turn KNOB MOUNT until the spout temperature is 100 F. Check that arrow marking A on the KNOB MOUNT still points upward after adjusting the thermostat to 100 F. If not, pull out the RED LOCKING DEVICE. Remove KNOB MOUNT by pulling it towards you while standing directly in front of the valve.

Reinstall the KNOB MOUNT so that the arrow marking A points upwards.

Reinstall RED LOCKING DEVICE.

109

112

SECURING RING

RED LOCKING

DEVICE

MOUNT

3 TRANSPOSED SUPPLY PIPING OR BACK TO BACK INSTALLATION

Should the hot and cold water supply pipes have been transposed making adjustment impossible, proceed as follows:

Shut off water supply.

Remove handle and rim

Remove check stops and re-install them transposed.

Important note: RED CHECK STOP is now on the right of the mixer body and the BLUE CHECK STOP is now on the left.

Turn the water supply back on and perform the temperature adjustment in step 2.

CHECK STOP

(RED TO BLUE)

CHECK STOP

(BLUE TO RED)

M 9 6 8 2 5 5 R e v . 1 . 1

Page 5
Image 5
American Standard T050.210 installation instructions ROUGHING-IN the Valve, Cold, Hot, Temperature Adjustment, Check Stop