Installation
Instructions
ENFIELDT373.742
BATH/SHOWERT373.741 TRIM KITS
T373.740
Thank you for selecting
To ensure that your installation proceeds
Certified to comply with ANSI A112.18.1
M 9 6 8 2 9 4 R E V 1 . 1
ATTENTION:
If TRIM T373.742 or diverter tub spout is used make sure TWIN ELL (B) P/N 8888.120 is connected to valve body as indicated in roughing- in sketch.
TWIN ELL
TWIN ELL P/N 8888.120 can be ordered as shown in the American Standard List Price Book
ROUGHING-IN DIMENSIONS
Installation for Bath/Shower,
Shower only, or Valve only Trim.
Dimensions are for reference.
| FINISHED WALL | ||
1/2" NPT | 1" MIN. |
| |
|
| ||
|
| ||
|
| ||
|
| OPTIONAL TO FINISHED | |
|
| FLOOR USUALLY | |
|
| BETWEEN 74'' AND 80'' | |
|
| FOR HEAD CLEARANCE | |
4" |
| ||
|
| ||
| 18" OPTIONAL | ||
| 1" MIN. |
| |
4" |
|
| |
1/2" NPT | TOP OF | ||
TUB RIM | |||
|
|
BOTTOM OF TUB
Required Tools
Phillips Screwdriver | Flat Blade Screwdriver |
Adjustable Wrench
Channel Locks
1 | TRIMINSTALL | CAUTION: Protect finish on SHOWER ARM, |
SHOWER HEAD and TUB SPOUT when installing. |
When finished tiling the wall, remove PLASTER GUARD (A) and turn off water supply.
Attach STEM ADAPTER (1) to TEMPERATURE CONTROL (2) valve stem with SELF TAPPING SCREW (3). Attach HANDLE SCREW (4) to VOLUME CONTROL ADAPTER (5).
Push CAPS (6) onto TEMPERATURE CONTROL (2) and VOLUME CONTROL ADAPTER (5).
Mount ESCUTCHEON (7) to valve body with SCREWS (8).
Push DIAL PLATE (9) over CAPS (6) and into the four alignment holes in ESCUTCHEON (7) and snap into place.
Remove PIPE CAP (10) and PIPE CAP (11) from shower pipe and tub filler pipe.
Install SHOWER ARM (17) with SHOWER ARM ESCUTCHEON (18), SHOWER HEAD (12) and TUB FILLER SPOUT (13) by threading onto pipe nipples. Use teflon tape or pipe sealant on pipe threads.
18
17
10
12
5
PLASTER GUARD (A)
4
6 | 7 | (4) ALIGNMENT |
|
| HOLES FOR |
|
| DIAL PLATE |
9
TWIN ELL (B) | 2 |
| |
| 3 |
1
8
11 13